1963]

U N I V E R S I T Y OF I L L I N O I S

541

2 969 232 326 28 479 $328 Oil

Alternate B Alternate C Alternate D Electrical Work for Extension of Steam and Electric Service — Kuhne-Simmons Company, Inc., Champaign Total, Materials Research Laboratory

Extension of Steam Service to Electrical Engineering Building for Air Conditioning Underground Steam Piping Work — Robert Gordon, Inc., Chicago.. $ 48 798 Base bid $ 46 798 Additive alternate for compact layers of clay topped with eight inches of top soil to prevent drowning out of clays above the steam main 2 000 Funds are available in the state capital appropriations to the University for 1961-63 from the Universities Building Fund and have been released. Additions to Underground Facilities for Education Building Storm Sewer — George S. Walker Plumbing and Heating, Inc., Decatur $ 16 390 Base bid for an 18-inch storm sewer $ 8 290 Additive alternate for the construction of a 12-inch storm sewer to be diverted around present building construction 8 100 Water Mains — Cross Construction, Inc., Urbana 3 636 Total, Education Building $ 20 026 Funds are available in the construction budget and have been released. Additions to Underground Facilities for the Illinois Street Residence Halls Sanitary and Storm Sewers •— Elton A. Wagner Company, Danville $ S3 200 Water — George S. Walker Plumbing and Heating, Inc., Decatur.. 30 524 Base bid providing for the extension of an 8-inch main with fire hydrants on the south side of Green Street from the Student-Staff Apartments east to the west side of Gregory Place and a 12-inch main on the west side of Goodwin Avenue from Green Street south to Illinois Street and an 8-inch main from the intersection of Illinois Street and Goodwin Avenue east to Gregory Place 28 474 Additive alternate for the substitution of ductile iron pipe for the 12-inch main in place of cast iron pipe 1 150 Additive alternate for the provision of an additional extension of the 8-inch water main under the existing steam tunnel in Goodwin Avenue if it is determined during construction that there is not sufficient clearance to go over the steam t u n n e l . . . . 900 Underground Steam Tunnel and Electrical Ductruns — Oran L. Shoemaker and Company, Champaign 108 308 Piping System for Steam Services — George S. Walker Plumbing and Heating, Inc., Decatur 77 770 Base bid $ 52 870 Additive alternate for the installation of an 8-inch utility pressure steam main which can be used as either a low-pressure or high-pressure steam main and which will operate normally as a low-pressure steam main to reduce the pressure drop in the lowpressure steam system 24 900 Thermal Insulation for Piping for Steam Services — Sprinkmann Sons Corporation of Illinois, Peoria 14 179 Base bid . . . . . . $ 7 242 Additive alternate for thermal insulation for additional 8-inch utility pressure steam main 6 937