1963]

UNIVERSITY OF I L L I N O I S

527

supplies such capital from sources other than state appropriations, such as the Illinois Building Authority.

This resolution was adopted by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Kerner, Mr. Page.

CONTRACTS FOR CONSTRUCTION OF THE CONGRESS CIRCLE CAMPUS

At the request of the President of the University, Director C. S. Havens of the Physical Plant presented a report he had made to the President on May 13, 1963, on the bids received on April 11 and 18, 1963, for all construction at the Congress Circle Campus with the exception of the Heating Plant and the Congress Circle Union Building. Copies of the report were distributed to all the Trustees at the meeting (and subsequently were sent to the absentees), and a copy was filed with the Secretary for record. Following this report, Director Havens presented specific recommendations made by him and the VicePresident and Comptroller for the award of contracts for construction of buildings, and other improvements, on the Congress Circle Campus including: the Staff and Administration Offices Building, Classroom Complex Building, Library Building, Site Development — Lecture Center, Engineering and Sciences Laboratories Building, Physical Plant Building, and landscaping, the award in each case being to the lowest bidder. Director Havens announced that recommendations will be submitted later for awards of contracts for the Heating Plant and the Union Building, which will complete construction of the first phase of the Congress Circle Campus. The specific recommendations for the awards of contracts follow.

General W o r k (Division 1) for all projects — Gust K. Newberg Construction Company, Chicago $23 943 930 00 Base bid $23 422 000 00 Additive alternates Assignment of other contracts to the general contractor 150 000 00 Painting various interior areas 3 000 00 Painting corridors 13 000 00 Substitute glass of 1 to 3 per cent light transmission for 9 to 11 per cent in the classroom complex 34 300 00 Substitute masonry wall for a chain link fence at Blue Island Avenue and at Roosevelt Road 40 000 00 Substitute Morgan Street entrance for a Blue Island entrance 35 000 00 Construct ramp and elevated walkway across Taylor Street. 143 000 00 Add suspended acoustical ceilings to certain rooms in the Staff and Administration Offices Building 3 000 00 Substitute plaster finish coat construction for dry wall in Staff and Administration Offices Building 33 000 00 Substitute concrete for stabilized base for areas to be paved 68 000 00