UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1964 [PAGE 58]

Caption: Board of Trustees Minutes - 1964
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 58 of 1633] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1962]

UNIVERSITY OF ILLINOIS

13

For Renovation and Equipping Laboratory Facilities for Research in Physiology and Biochemistry from Indirect Costs (General) $10 600 I concur.

On motion of Mrs. Watkins, these assignments of funds were made by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mrs. Watkins, Mr. Wilkins, Mr. Williamson; no, none; absent, Mr. Harewood, Mr. Kerner, Mr. Swain.

APPROPRIATIONS FOR NONRECURRING EXPENDITURES (13) The Committee on Nonrecurring Appropriations recommends the following appropriations and assignments of funds from the University General Reserve: 1. College of Agriculture Dairy Science, fluorescent lights in Animal Sciences Laboratory $ 7 304 Forestry, pressure-vacuum cylinder ' 10 000 2. College of Education, remodeling basement in Lincoln Hall for research space 16 000 3. College of Engineering Electrical Engineering, equipment 50 000 Engineering Experiment Station, multichannel analyzer for nuclear engineering 20 000 4. College of Liberal Arts and Sciences Botany, research facilities 4 650 Chemistry Remodeling and rehabilitation of laboratory and other areas used by the analytical, biochemistry, inorganic, organic, and physical divisions 30 000 Undergraduate laboratory equipment 21 361 Geology, equipment and remodeling. 7 615 Zoology, revamping water supply for Vivarium 4 317 5. Library Administration, 2,000 books for library at Pennsylvania Avenue Residence Halls 10 000 6. College of Physical Education, renovation of deck space at the English Building swimming pool for office quarters and showers 8 500 7. Office of Public Information, multigraph duplicating equipment 3 396 8. Physical Plant Skating Rink, roof repairs 3 200 Remodeling in the English Building to provide two additional classrooms 5 865 9. University Press, inserting machine for Mailing Center 15 000 10. Chicago Medical Center Medical Research Laboratory, installation of electronic air cleaners.. 4 800 Research and Educational Hospitals, equipment (magnascanner) 9 600 Total $231 608 I concur.

On motion of Mrs. Watkins, these appropriations were made, as recommended, by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mrs. Watkins, Mr. Wilkins, Mr. Williamson; no, none; absent, Mr. Harewood, Mr. Kerner, Mr. Swain.

CONTRACT FOR CAMPUS BUS SERVICE (14) The Director of the Physical Plant and the Vice-President and Comptroller recommend authorization of a contract with the Champaign-Urbana City Lines, Inc., for a campus bus service for students and staff along the lines of the bus service operated under a University contract last year. Specific recommendations are that: Authority be granted to continue the 1111 Bus operation during the 1962-63 academic year starting September 11, 1962. The five-cent fare per passenger be continued except that those students living in Orchard Downs will be issued passes to ride free from the Downs to any point on the route; however, the passes will be honored only for a return trip