488

BOARD OF TRUSTEES

[ M a y IS

4. Physical Plant Department Remodeling in Animal Science Laboratory for Department of Dairy Science 3 400 00 Installing electrical service in Old Agronomy Storehouse for Department of Forestry 3 480 00 Installing water lines to Machine Shed for Department of Plant Pathology 7 000 00 Remodeling and air conditioning in Lincoln Hall for Bureau of Educational Research 12 240 00 Installing air conditioners in offices in Gregory Hall for College of Education 3 330 00 Remodeling in Central Receiving buildings for Department of Civil Engineering 6 590 00 Constructing a sidewalk in front of Women's Gymnasium 4 000 00 Remodeling offices and laboratories in Natural History Building 20 240 00 Chicago Undergraduate Division 5. College of Engineering Department of Physics, equipment (matching funds for Atomic Energy Commission grant) 6 000 00 Medical Center 6. College of Pharmacy Department of Chemistry, equipment 6 237 80 7. Research and Educational Hospitals Operating Rooms, equipment 4 250 00 Department of Radiology, equipment 18 000 00 T o supplement operating budget for 1961-62 103 000 00 Total, University General Reserve (242 167 80) T h e Committee on Nonrecurring Appropriations also recommends the following assignments of funds for the Medical Center from Indirect Costs, General: 8. Medical Research Laboratory, animal cages and equipment 100 000 00 Grand Total $342 167 80

On motion of Mr. Hughes, these appropriations were made by the following vote: Aye, Mr. Clement, Mr, Dilliard, Mr. Hughes, Mr. Page, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Johnston, Mr. Kerner.

C O N T R A C T S F O R C O N S T R U C T I O N O F T H E S O U T H ADDITION T O T H E ADMINISTRATION BUILDING (12) T h e Director of the Physical Plant and the Vice-President and Comptroller recommend award of contracts for construction of a south addition to the Administration Building, the award in each case being to the lowest bidder: General — Kuhne-Simmons Co., Inc., Champaign $1 032 095 Base bid $1 024 900 Additive alternates Service charge for supervision of other contracts assigned to this contractor 13 336 Installing acoustical ceilings in classrooms 747 Installing Venetian blinds 2 018 Deductive alternates Omitting metal lath — 8 906 Omitting "critical-path method" of scheduling for job control No change Electrical — Square Deal Electrical Contracting, Inc., Urbana 121 025 Base bid 118 500 Additive alternate for starters for added air conditioning 2 525 Plumbing — F . R. Inskip, an individual doing business as F . R. Inskip and Company, Champaign 69 972