UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1964 [PAGE 283]

Caption: Board of Trustees Minutes - 1964
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 283 of 1633] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



238

BOARD OF TRUSTEES

[November 9

Urbana-Champaign 1. College of Agriculture Department of Agronomy, South F a r m heating system $ 2 800 Department of Plant Pathology, equipment 5 965 Department of Forestry, pressure-vacuum cylinder and related instrumentation (an addition to $10,000 appropriated July 18, 1962) 4 600 2. College of Education Industrial Education, equipment (surface planer and Universal grinder) 6 900 University High School, audio-visual equipment and library expansion 7 227 3. College of Engineering Department of Civil Engineering, Universal testing machine 25 500 Physics Betatron, prefabricated metal building 8 000 4. College of Fine and Applied Arts School of Music, practice pianos and organs 36 000 5. College of Liberal Arts and Sciences Department of Chemistry and Chemical Engineering, undergraduate teaching equipment 5 266 Department of Mathematics, equipment 8 135 Department of Psychology, Comparative Laboratory furnishings and equipment 9 322 6. Library, equipment 21 520 7. College of Physical Education Ice Rink, ice resurfacer 8 500 8. Physical Plant Department Department of Mechanical Engineering, remodeling to increase research space and for expansion of Machine Shop 4 400 9. Statistical Service Unit, auxiliary equipment for the 1401 IBM Computer 5 242 10. University Extension Audio-Visual Aids Service, replacement of equipment, materials, and supplies lost in a fire (an addition to $25,000 appropriated April 19, 1961) 30 040 Total Urbana-Champaign (189 417) Chicago Undergraduate Division 11. College of Architecture and Art, equipment 4 540 12. Library, additional acquisitions 15 000 Medical Center 13. Physical Plant, replacement of ducts in the Medical Research Laboratory 33 000 14. College of Pharmacy, equipment 14 000 Grand Total $255 957 I concur. O n m o t i o n of M r . J o h n s t o n , t h e s e a p p r o p r i a t i o n s w e r e m a d e b y t h e

following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Hughes, Mr. Kerner, Mr. Wilkins.

CONTRACTS FOR MODERNIZATION OF ELEVATORS (6) T h e Director of the Physical Plant and the Vice-President and Comptroller recommend awards of contracts for modernization of elevators in three buildings, the award in each case being to the lowest bidder: Montgomery Elevator Company, Chicago David Kinley Hall $24 398 Westinghouse Electric Corporation, Elevator Division, Chicago Mumford Hall 30 367 Library 29 870