UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1964 [PAGE 274]

Caption: Board of Trustees Minutes - 1964
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 274 of 1633] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1962]

UNIVERSITY OF ILLINOIS

229

STATE OF ILLINOIS 1 „ C O U N T Y O F C H A M P A I G N / ss" I, , do hereby certify that I am the duly elected, qualified and acting Secretary of The Board of Trustees of the University of Illinois, and as such official have charge and custody of the minutes and records of said Board of Trustees. I further certify that the attached resolution is a true, correct and exact copy of the original resolution adopted by T h e Board of Trustees of the University of Illinois at its legally convened meeting held on the 17th day of October, 1962, all as appears of record in my office. I N W I T N E S S WHEREOF I have hereunto set my hand and the seal of said University this day of — , 19. Secretary as aforesaid.

C O N T R A C T S FOR C O N S T R U C T I O N O F ILLINOIS S T R E E T R E S I D E N C E HALLS (24) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of contracts for the construction of the Illinois Street Residence Halls (for 1,210 single undergraduate students) in the area between Illinois and Green Streets and east of the Student-Staff Apartments in Urbana, the award in each case being to the lowest bidder: General — Kuhne-Simmons Company, Inc., Champaign $3 639 870 Base bid $3 669 870 Deductive alternates for omission of reflective pool in central court and substitution of top soil; replacement of all black walnut wall paneling in the food service building and the two residence hall buildings with painted plaster; substitution of enamel finish on ceilings in toilet rooms and shower rooms in the dormitory buildings for ceramic tiled ceilings —30 000 Elevator — Otis Elevator Company Chicago 183 381 Food Service Equipment — Century Equipment Company, Chicago 190 696 Plumbing— Nu-Way Plumbing Service, Inc., Chicago 429 S00 Base bid $ 436 000 Deductive alternate for omission of reflecting pool in the central court and substitution of a drain in the filled court and a storm sewer from the drain to a manhole in the court —6 500 Heating, Piping, and Refrigeration—Borg, Inc., Chicago 353 730 Ventilating — R. H. Bishop Company, Champaign 197 844 Thermal Insulation — General Insulation, Inc., Peoria 69 900 Temperature Control — Minneapolis-Honeywell Regulator Company, Chicago 35 961 Base bid $ 51 627 Deductive alternate for omission of the central control center — 15 666 Electrical — Art-O-Lite Company, Inc., Galesburg 407 880 Base bid $ 419 200 Deductive alternates for omission of all electrical work for the reflecting pool fountain system; all wiring and equipment from communications sound system; secondary clocks in corridors and floor lounges in the two residence hall buildings and offices in the lounge building —11 320 Total $5 508 762