BOARD OF TRUSTEES

[June 17

of Trustees for approval in advance, in accordance with previous practice and authorization. I concur. O n motion of M r . Williamson, these contracts were awarded, and authority w a s given as requested, by the following vote: Aye, Mr. Clement, M r . Johnston, Mr. Jones, M r . Page, M r . Pogue, M r . Swain, M r s . W a t k i n s , M r . Williamson; no, none; absent, M r . Dilliard, Mr. H u g h e s , M r . Kerner.

CONTRACT FOR PLASTERING. PLASTER PATCHING A N D REPAIRS, A N D ACOUSTICAL WORK

(25) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of a cost-plus contract to George S. Grimmett, doing business as George S. Grimmett and Company, Springfield, the lowest bidder, for plastering, plaster patching and repairs, and acoustical work during the fiscal year ending June 30, 1965, on the basis of a contractor's fee of 13.9 per cent of all actual job costs as determined by itemized billing. I concur.

On motion of Mr. Johnston, this contract was authorized by the following vote: Aye, Mr. Clement, Mr. Johnston, Mr. Jones, Mr. Page, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Dilliard, Mr. Hughes, Mr. Kerner.

CONTRACTS FOR REMODELING IN DENTISTRY-MEDICINEPHARMACY BUILDING

(26) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of contracts for remodeling in the first unit of the DentistryMedicine-Pharmacy Building, the award in each case being to the lowest bidder: General — Heller Construction Company, Inc., Chicago $25 252 Base bid $23 459 Additive alternate for service charge for supervision of other contracts assigned to this contractor 1 793 Laboratory Equipment — Duralab Equipment Corporation, Chicago 27 974 Plumbing — Reid Mechanical Contractors, Inc., Chicago 8 222 Heating and Process Piping — Ashland Plumbing and Heating Company, Chicago 7 964 Ventilating — Hedmark Sheet Metal Company, Inc., Glen Ellyn 19 595 Pipe Covering and Insulation — W. J. Donahoe Company, Chicago 1 455 Electrical — Midwest Interstate Electrical Construction Company, Chicago 7 220 Total $97 682 This work will include rehabilitating the west half of a student laboratory (Biochemistry Room 304) by installation of new partitions, laboratory furniture, improvement of the lighting level and mechanical ventilation, installation of resilient flooring, and painting. The remodeling is a continuation of remodeling in this area which was completed during the 1961-63 biennium. It is further recommended that all contracts other than the contract for general work be assigned to the contractor for that work, making the total of his contract price $97,682; and that an agreement be entered into with Heller Construction Company, Inc., for the assignment of these other contracts for $1,793 which amount is included in the contract price, being the amount bid by that Company for service charge for supervision of other contracts assigned to the general contractor. Funds for this work are available in the state capital appropriations to the University for 1963-65. Submitted herewith is a schedule of all bids received and a copy is being filed with the Secretary of the Board for record. I concur. O n motion of M r s . Watkins, these contracts were awarded, as recommended, by the following vote: Aye, M r . Clement, M r . Johnston,