UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1515]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1515 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1512

BOARD OF TRUSTEES

[ J u n e 20

The additional rental rate is $201 per month and the University would assume the additional costs of utilities, interior maintenance, and janitor service. The Director of the Physical Plant and the Vice-President and Comptroller recommend that: T h e Foundation be requested to revise the lease as indicated above and exercise the option to renew for an additional five-year period; The sublease from the Foundation to the University be increased by $201 per month as of September 1, 1962; and that Funds be assigned from indirect costs as follows: Addition to the Physical Plant Department operating budget for the annual rental $2 412 Annual operation and maintenance costs 1 100 Total $3~512 1 concur.

On motion of Mr. Johnston, this recommendation was approved, and the requested assignment of funds was made, by the following vote: Aye, Mr. Clement, Mr. Harewood, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Wilkins, Mr. Williamson; no, none; absent, Mr. Dilliard, Mr. Kerner.

REPAIR OF SMOKE STACK AT ABBOTT POWER PLANT (22) As a result of a recent inspection of the No. 2 smoke stack at the Abbott Power Plant, which has been in continuous service since its construction in 1952 by Custodis Construction Company, Inc., Chicago, the Physical Plant Department recommended authorization of certain necessary repairs after the inspection report had been reviewed with Sargent and Lundy, Chicago, consulting engineers for the University on power plant installations who concurred in the recommendation. Emergency action was necessary to avoid overloading stack No. 1 when the air-conditioning season started, as overload would have reduced the capacity of the boilers and required curtailment of the use of electricity. The Director of the Physical Plant and the Vice-President and Comptroller request confirmation of the employment of the Custodis Construction Company, Inc., to make the repairs on the basis of the actual cost of labor and materials plus cost of insurance, plus 15 per cent for the firm's overhead and 15 per cent for its commission. The total project was estimated to require three weeks and cost approximately $10,000. Funds are available in the Physical Plant operating budget for the fiscal year 1961-62. I concur. O n m o t i o n of M r . P o g u e , t h e e m p l o y m e n t of t h e C u s t o d i s C o n s t r u c tion C o m p a n y , Inc. w a s confirmed. ADDITION TO CONTRACT FOR CONSTRUCTION OF ASSEMBLY HALL (23) The Director of the Physical Plant and the Vice-President and Comptroller recommend an increase of $24,164.70 in the contract with Felmley-Dickerson Company, Urbana, for the construction of the Assembly Hall to install and operate well points and pumping equipment on the inside perimeter of the Assembly Hall prior to and during excavation of the existing cone of earth in the center portion of the building. Funds are available from the proceeds of the revenue bonds issued to finance construction of the Assembly Hall. I concur. O n m o t i o n of M r . S w a i n , t h i s c h a n g e in c o n t r a c t w a s a u t h o r i z e d . ADDITION TO CONTRACT FOR CONSTRUCTION OF THE ILLINI UNION ADDITION (24) The Director of the Physical Plant and the Vice-President and Comptroller recommend an increase of $5,606 in the contract with Felmley-Dickerson Company, Urbana, for construction of the Illini Union addition to provide modifica-