UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1512]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1512 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1962]

UNIVERSITY OF I L L I N O I S

1509

General — Shapland Construction Company, Champaign $1 117 300 Base Bid $1 064 000 Additive Alternate for service charge for supervision of other prime contracts assigned to the general contractor 18 500 Additive Alternate for sidewalks and similar site work 34 800 Heating and Ventilating — Montefusco Heating and Sheet Metal Company, Peoria: Heating 60 943 Ventilating 9 748 Site Work and Outside Utilities — P a r r o Construction Corporation, Urbana 169 900 Electrical Work — Potter Electric Service, Inc., Urbana 105 177 Base Bid $ 96 860 Additive Alternate for exterior area lighting 8 317 Plumbing W o r k — R. Hays Company, Inc., Champaign 145 000 Total.... $1 608 068 It is further recommended that all contracts other than the general contracts be assigned to the contractor for the general work, making the total of his contract price $1,608,068. It is further recommended that an agreement be entered into with Shapland Construction Company for the assignment of these other contracts for $18,500, which amount is included in the contract price, being the amount bid by that Company for service charge for supervision of other contracts assigned to the general contractor. Funds are available in the proceeds from the sale of the Board of Trustees of the University of Illinois, Revenue Bond Series A. Submitted herewith is a supporting memorandum from the Physical Plant Department, including a schedule of all bids received, a copy of which is being filed with the Secretary of the Board for record. I concur. O n m o t i o n of M r . S w a i n , t h e s e r e c o m m e n d a t i o n s w e r e a p p r o v e d

and the contracts were awarded, as recommended, by the following vote: Aye, Mr. Clement, Mr. Harewood, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Wilkins, Mr. Williamson; no, none; absent, Mr. Dilliard, Mr. Kerner.

CONTRACTS FOR SWITCHGEAR AND ELECTRICAL EQUIPMENT FOR THE HEATING PLANT AT CONGRESS CIRCLE (17) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of the following contracts for the furnishing and installation of switchgear and electrical equipment for the heating plant at Congress Circle campus: Congress Circle campus: Item 1. 15 K V Switchgear — Allis-Chalmers Manufacturing Company.. $ 38 200 Item2. 5 KV Switchgear-—Allis-Chalmers Manufacturing Company... 44 800 Item3. 480 V Substation — Allis-Chalmers Manufacturing Company... 29 650 Item 4. Motor Control Centers — General Electric Company 7 025 Item 5. D-C Distribution Cubicles — General Electric Company 2 531 Item6. 125-Volt Battery—Allis-Chalmers Manufacturing Company... 5 794 Item 7. Inverter-Diverter and Control Panel — Allis-Chalmers Manufacturing Company 8 851 Total $136 851 Funds are available in the state capital appropriations to the University for 1961-63 from the Universities Building Fund subject to release by the Governor. The University has reserved the right to terminate this contact prior to September 15, 1962, for any reason without cost to the University by giving the contractor written notice of such termination. The above recommendations propose the award of contracts to the lowest