UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1461]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1461 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1458

BOARD OF TRUSTEES Department Housing Division Vendor Herb Wise Service, Champaign

[May 24

Cost $ 8 190 00 f.o.b. delivered and installed 9 956 16 f.o.b. delivered and installed 4 723 29 f.o.b. delivered

Item 39 commercial automatic washing machines, coin-operated, to be furnished and installed in Residence Halls, as needed, during the period July 1 to December 31, 1962 Furnish and install rugs and padding in the south lounge of the Iliini Union addition: 3 rugs — 23 ft. x 24 ft. 8 in. 2 rugs — 9 ft. 3 in. x 26 ft. 6 in. 1 rug— 9 ft. 3 in. x 24 ft. 8 in. Lounge tables and chairs for Iliini Union addition: 5 card tables 24 end tables 2 sofa tables 5 coffee tables 20 card table chairs Four portable choral risers (for choral concert ensembles), three levels Twelve portable stage units, 8 ft. x 6 ft. x 16 in. high, complete with guard rails, chair stops, and height extensions Four sets of stairs 28,900 reams paper, white, sulphite offset, of various sizes and weights, estimated t e n - m o n t h supply for the Medical Center and Urbana One hoist system, three-ton electric, overhead, complete with all necessary track, switch, and electrical equipment Furnish, deliver, and erect one building, storage, metal sides and roof, 32 ft. x 60 ft., to be located on Horticulture Farm for Plant Pathology Department storage of farm machinery, tools, fungicides, and fertilizers Three truckloads (6,645 gallons) synthetic floor finish to be delivered to the Physical Plant Storeroom in July, 1962, November, 1962, and March, 1963 Lumber, for a one-year period (July 1, 1962, through June 30, 1963), the following estimated quantities to be furnished as needed by the Physical Plant Storeroom: approximately 24,000 bd. ft., No. 2 spruce; 78,000 bd. ft. construction grade fir; 13,000 bd. ft. " C " select pine; 13,000 bd. ft. clear fir flooring Plywood, douglas fir; for a one-year period (July 1, 1962, through June 30, 1963): 1,710 sheets Interior A-B 170 sheets Exterior A-A 220 sheets Exterior A-B 600 sheets Interior A-D 250 sheets Interior C-D Building materials for the year beginning July 1, 1962: 600 sheets tapered edge wallboard 229 sheets asbestos board 100 sheets pressed fibre board 75 sheets insulation board 320 sheets tempered hardboard 50 tempered pegboard One 1962 truck, 14,000 pounds, GVW, 1H ton capacity, with 12 foot long van body; this vehicle is an addition to the University's fleet and will be used by the Central Receiving Station to meet the expanding delivery needs

Iliini Union

Marshall Field & Co., Chicago

Iliini Union

Montgomery Ward & Co.. , Chicago

Iliini Union

Chapman-Young, Inc., Kirkwood, Mo.

4 993 70 f.o.b. delivered

Office Supply Stores, Urbana and Chicago Physical Plant

Bradner Smith & Co., Chicago Cleveland Tramrail Haigh Co., Division of Mason W. Haigh & Sons, Inc., Peoria Alexander Lumber Co., Champaign

34 077 50 f.o.b. delivered

4 494 00

f.o.b. delivered

Physical Plant

3 415 00 f.o.b. delivered and erected 11 080 86 f.o.b. delivered 17 603 50 f.o.b. delivered

Physical Plant Storeroom

International Chemical Co., Chicago Long Lumber Co., Champaign

Physical Plant Storeroom

Physical Plant Stores

Kochton Division, General Plywood Corp., Decatur

13 771 89 f.o.b. delivered

Physical Plant Stores

Hillcrest Lumber Co., Champaign

4 577 84 f.o.b. delivered

Purchasing

International Harvester Co.. Springfield

3 823 62 f.o.b. delivered