EXTRACTED TEXT FROM PAGE:



1962]

UNIVERSITY OF ILLINOIS

1311

On motion of Mr. Swain, this contract was awarded, as recommended, by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Harewood, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Hughes, Mr. Kerner, Mr. Wilkins.

C O N T R A C T F O R E N G I N E E R I N G S E R V I C E S ON STORM AND SANITARY S E W E R S AND W A T E R MAINS (26) The Director of the Physical Plant and the Vice-President and Comptroller recommend employment of Wilson and Anderson, Consulting Engineers, Champaign, for the engineering services to design the construction of, and to write the specifications for, sanitary and storm sewers and water mains to service the new buildings for the College of Commerce and Business Administration and the College of Education, and the Illinois Street Residence Halls. Payments for these services will be on the basis of Schedule A of Minimum Fees of the Illinois Society of Professional Engineers, exclusive of the services of a resident engineer for field inspection: Cost of Construction Basic Fee First 12.00 per cent $ 50 000 9.00 per cent Next 100 000 7.50 per cent Next ISO 000 6.50 per cent Next 200 000 6.00 per cent Next 500 000 5.50 per cent Next 1 000 000 5.00 per cent All over 2 000 000 The total estimated cost will be approximately $10,000 for the engineering services on storm and sanitary sewers and water mains for the Commerce and Education Buildings and $10,000 for the engineering services on the same utilities for the residence halls. Funds are available in the state capital appropriations from the Universities Building Fund. Submitted herewith are supporting memoranda from the Physical Plant Department, copies of which are being filed with the Secretary of the Board for record. T h e Committee on Buildings and Grounds has been consulted and supports the recommendation. I concur. O n m o t i o n of M r . J o h n s t o n , t h i s c o n t r a c t w a s a w a r d e d , a s r e c o m mended, b y t h e f o l l o w i n g v o t e : A y e , M r . C l e m e n t , M r . D i l l i a r d , M r . Harewood, M r . Johnston, M r . Pogue, M r . Swain, M r s . W a t k i n s , M r . Williamson; no, n o n e ; absent, M r . H u g h e s , M r . K e r n e r , M r . Wilkins. CONTRACT F O R E N G I N E E R I N G S E R V I C E S F O R C O R R E C T I O N O F ELECTRICAL D E F I C I E N C I E S AT URBANA-CHAMPAIGN (27) The Director of the Physical Plant and the Vice-President and Comptroller recommend employment of the firm of Carroll-Henneman and Associates, Consulting Engineers, Urbana, for engineering services in designing and writing specifications for correction of electrical deficiencies, including transformer vault improvements in thirteen buildings on the Urbana-Champaign campus. The total construction and installation cost of correction of electrical deficiencies in these buildings is estimated to be $245,000. T h e firm recommended will do the work on the basis of Schedule B of Minimum Fees Adopted by the Illinois Society of Professional Engineers, which, exclusive of the services of a resident engineer for field inspection, is: Cost of Construction First $ 20 000 Next 30 000 Next 50 000 Next 200 000 Next 200 000 Next 500 000 Next 1 000 000 All over 2 000 000 Basic Fee 10.00 per cent 9.00 per cent 7.00 per cent 6.00 per cent 5.50 per cent 5.00 per cent 4.75 per cent 4.50 per cent