UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1962 [PAGE 1309]

Caption: Board of Trustees Minutes - 1962
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1309 of 2250] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1306

BOARD OF TRUSTEES

[February 21

it will include certain physical education and recreation facilities which are a proper charge against state funds. I concur in these recommendations. On motion of Mr. Harewood, these recommendations were approved, and authority was given, as requested, this action being taken by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Harewood, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Hughes, Mr. Kerner, Mr. Wilkins.

APPROPRIATIONS FOR NONRECURRING EXPENDITURES

(14) The Committee on Nonrecurring Appropriations recommends the following appropriations and assignments of funds: Physical Plant Remodeling Agricultural Engineering Building $ 5 360 Remodeling quonset building for Civil Engineering (supplements appropriations of $35,000 made in July, 1960, and June, 1961) 17 200 Completion of Labor and Industrial Relations Building 24 700 Department of Forestry, Universal timber-testing machine 21 975 Institute of Labor and Industrial Relations, equipment in new building. . . . 22 100 College of Liberal Arts and Sciences, remodeling and equipment for Language Laboratory 3 000 Total, General Reserve $94 335 Physical Plant Repair cold storage rooms at Horticulture Field Laboratory $10 650 Remodeling 1203 West Nevada Street for School of Music 39 000 Remodeling Research and Educational Hospitals for Rehabilitation Center 16 370 Total, State Capital Appropriations $66 020 Library — for books $50 000 Total, Indirect Costs General $50 000 I concur. On motion of Mr. Johnston, these appropriations were made, as recommended, by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Harewood, Mr. Johnston, Mr. Pogue, Mr. Swain, M r s . Watkins, Mr. Williamson; no, none; absent, Mr. Hughes, Mr. Kerner, Mr. Wilkins.

APPROPRIATION AND ADDITION TO CONTRACT FOR HEALTH SERVICE ADDITION TO McKINLEY HOSPITAL

(15) The Director of the Physical Plant and the Vice-President and Comptroller recommend (1) an increase of $4,323.90 in the contract with Snyder Construction Company, Inc., Vincennes, Indiana, for the construction of the Health Service Addition to McKinley Hospital, for removal and replacement of linoleum in the first and second floor corridors of McKinley Hospital plus installation of tile stair treads between the two floors; the corridors will connect the Hospital with the new Health Service Building; and (2) an assignment of $4,323.90 from the state capital appropriations to the University from the Universities Building Fund for this additional work. I concur. On motion of Mr. Pogue, the change in contract was authorized, and the requested assignment of funds was made by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Harewood, Mr. Johnston, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Hughes, Mr. Kerner, Mr. Wilkins.

CONTRACT FOR CONSTRUCTION OF PHYSICAL PLANT SERVICE BUILDING

(16) The Director of the Physical Plant and the Vice-President and Comptroller