UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 969]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 969 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1968]

UNIVERSITY OF ILLINOIS

917

On motion of Mr. Clement, the foregoing resolution was adopted.

CONSULTING SERVICES REGARDING OAKLEY DAM AND RESERVOIR PROJECT

the Northwest Corner of the tract of land conveyed by The Board of Trustees of the University of Illinois, a public corporation, as Grantor, to The Athletic Association of the University of Illinois, as Grantee, by Warranty Deed dated November 24, 1958, and filed for record in the Recorder's Office of Champaign County, Illinois, on December 19, 1958, at 4:00 P.M., in Book 612 of Records on Page 114 as Document No. 621449, thence West One Thousand Six Hundred Fifty and Ninety-three Hundredths feet (1650.93') along a line Thirtythree feet (33') South of and parallel to the North line of said Section Two (2), thence South One Hundred Fifty feet (150') along a line parallel to the West line of said North East Quarter (NE \i) thence East, One Thousand Six Hundred Fifty and Ninety-three Hundredths feet (1650.93') along a line parallel to the North line of said Section Two (2), thence in a Northerly direction to and along the West line of said tract of land conveyed by Grantor to Grantee by said Warranty Deed dated November 24, 1958, One Hundred Fifty feet (15C), more or less, to the point of beginning, and all situated in Champaign County, Illinois, subject to building restrictions and easements of record.

(31) In accordance with the request of the Board of Trustees, this proposal is presented for the award of a contract to Harza Engineering Company, Chicago, to investigate alternatives to the 1966 Corps of Engineers plan for a conservation pool behind Oakley Dam and Reservoir, which will permanently inundate 600 acres of land in Robert Allerton Park. The objectives of the study are: 1. To identify and appraise very generally a broad range of concepts for water resource development and management projects as alternatives to the "higher" Oakley Reservoir. 2. To determine whether any of the alternatives are sufficiently promising to merit the expense of further in-depth engineering and economic investigation. 3. To design a program of investigation and analysis for detailed investigation of the promising alternatives. Harza Engineering Company estimates that eight weeks would be required to complete the study, after which they will publish a report. They propose a fee of $15,000 for the study and report. Funds are available for this study from the income of Robert Allerton Farms. The Chairman of the Buildings and Grounds Committee and all appropriate administrative officers have been consulted. On motion of M r . Grimes, the recommendation was approved with the understanding that the proposed fee be appropriately reduced if the study should indicate no need to proceed with item 3 ; this action was taken by the following vote: Aye, Mr. Clement, Mr. Grimes, Mr. Halm, Mr. Jones, M r . Swain; no, Mr. P o g u e ; absent, M r . Hughes, Governor Kerner, Mr. Page, D r . Weatherly, Mr. Williamson.

MIDYEAR DEGREES

The Secretary presented for record the following list of degrees conferred on candidates at Urbana-Champaign on February 15, 1968, in accordance with the authorization of the Board. Graduate Doctor Doctor Doctor Doctor Master Master Master Summary College of Philosophy of Education of Business Administration of Musical Arts of Arts of Science of Music

142 12 1 2 118 249 6