840

BOARD OF TRUSTEES

[December 20

firms for complete engineering services, including design and bid documents, for the following projects and on the terms indicated : Urbana-Champaign Campus Sargent & Lundy, Engineers, Chicago Actual costs of engineering and Improvements and extensions to the drafting personnel plus SO per steam and electric distribution systems, cent; wages of other personnel to serve the following proposed buildings and direct costs at actual wages and additions: Music Building, Foreign and costs; two per cent of the Languages Building, and Library Fifth actual cost of construction; and Stack Addition if a resident engineer is required, actual salary plus 35 per cent plus expenses authorized by the University Medical Center Campus Pioneer Service & Engineering Co., ChiEngineering and drafting personcago nel at actual costs plus 75 per Increase the electrical capacity for the cent; and direct costs Ncuropsychiatric Institute Funds are available for the above projects in state capital appropriations to the University and have been released by the Governor. The Advisory Committee on Architectural and Engineering Services and all appropriate administrative officers have been consulted. O n m o t i o n of M r . W i l l i a m s o n , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d by the following vote: A y e , M r . Clement, M r . Grimes, M r . H a h n , Mr. H u g h e s , M r . Jones, M r . Page, Mr. Swain, M r . Williamson; no, n o n e : absent, Governor Kerner, M r . Pogue, D r . Weatherly. ASSIGNMENT OF A PURCHASE AWARD FOR ART SCULPTURE AND STUDIO BUILDINGS, URBANA (22) On November 10, 1967, the Board of Trustees approved the award of a contract to Decatur Construction, Inc., Decatur, the lowest bidder, for the construction of two buildings for sculpture and art studios at the Urbana campus at a cost of $32,974. Due to a change in franchise affiliation, Decatur Construction, Inc., will no longer be a dealer for the proposed building, and has requested that the contract award be assigned to the manufacturer of the building, Armco Metal Products Division, Armco Steel Corporation, South Bend, Indiana. The latter has agreed to accept this assignment. The President of the University recommends that this assignment be consented to and that a contract be entered into with the Armco Metal Products Division, Armco Steel Corporation, South Bend, Indiana, at the same amount and on the same terms and conditions as originally approved. O n m o t i o n of M r . C l e m e n t , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d . ASSIGNMENT OF CONTRACT (23) The General Dynamics Corporation has announced the sale of their General Atomic Division to the Gulf Oil Corporation. Since the University has two purchase orders with General Atomic in the amounts of $119,075 and $141,700 which were approved by the Board of Trustees on July 27, 1966, and November 10, 1966, respectively, for fuel and materials and services to upgrade the University's T R I G A Nuclear Reactor, the University has been requested to make assignment of these orders to Gulf General Atomic, Inc., a subsidiary of Gulf Oil Corporation. It is recommended that the orders be assigned to the new corporation for the provision of services and materials ordered. There will be no technical or monetary loss in such assignment. T h e Director of Purchases has proposed and the Vice-President and Comptroller recommends that the assignment of orders be made. I concur. O n m o t i o n of M r . C l e m e n t , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d .