Mr. Hughes, Mr. Johnston, Mr. Jones, Mr. Page, Mr. Pogue, Mrs. Watkins, Mr. Williamson; no, none; absent, Governor Kerner, Mr. Swain.

CONTRACTS FOR REMODELING IN MUMFORD HALL A N D AGRONOMY STOREHOUSE (21) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of cost-plus contracts and the assignment of $114,100 from the General Reserve for remodeling in the basement and Room 310 of Mumford Hall and in the Agronomy Storehouse. Per Cent Per Cent Per Cent Estimated for for for SubFee Material Labor contracts Payment General Work— Dean Evans Co., Champaign 10 31 10 $9 190 00 Electrical W o r k — E m r i c Electric, Inc., Champaign 13 22 5 2 940 00 Plumbing Work — Willis H. Thomas & Wren C. Thomas, a partnership doing business as Thomas Plumbing & Heating Co., Urbana 25 40 3 2 440 00 Heating, Piping, Refrigeration, and Automatic Temperature Control Systems Work — Cool-Rite Refrigeration, W. L. Rogers, owner, Urbana. . 2 5 30 10 2 070 00 Submitted herewith is a report from the Physical Plant Department, including a schedule of the bids received, a copy of which is filed with the Secretary of the Board for record. I concur. O n m o t i o n of M r . H u g h e s , t h e s e c o n t r a c t s w e r e a w a r d e d , a s r e c o m mended, by the following vote: Aye, M r . Clement, M r . Dilliard, M r .

Hughes, Mr. Johnston, Mr. Jones, Mr. Page, Mr. Pogue, Mrs. Watkins, Mr. Williamson; no, none; absent, Governor Kerner, Mr. Swain.

CONTRACTS FOR REMODELING IN T H E METALLURGY AND MINING BUILDING (22) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of cost-plus contracts for remodeling the fourth floor of the Metallurgy and Mining Building for the Charged Particle Research Laboratory of the Department of Electrical Engineering to the lowest bidders. Per Cent Per Cent Per Cent Estimated for for for SubFee Material Labor contracts Payment General Work — Dean Evans Co., Champaign 10 31 10 $ 1 2 7 0 00 Electrical Work — William H. Brunkow doing business as Brunkow Electric Company, Champaign. . 10 25 0 1 045 00 Heating, Piping, Refrigeration, and Automatic Temperature Control Systems W o r k — W . L. Rogers, William Goldstein, C. L. Rogers, and A. Rogers, a partnership doing business as Cool-Rite Refrigeration, Urbana 25 30 10 1 4 3 5 00 Ventilation and Distribution Systems for Conditioned Air—Cool-Rite Refrigeration, W. L. Rogers, owner, Urbana. . . 25 30 10 535 00