Caption: Board of Trustees Minutes - 1968 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1966] UNIVERSITY OF ILLINOIS 31 Street and Street Lighting Improvements ($808,000). The street improvements include five projects involving the widening of streets adjacent to the campus, the extension of pavement alongside one street, and the extension of another street (for a total of $698,000). Funds for street lighting improvements in the amount of $110,000 are requested — for lighting projects on two streets (Florida Avenue, from Neil Street to Lincoln Avenue; Gregory Drive, from Oak Street to Fourth Street). Utilities Distribution System ($2,373,000). This item includes funds for extensions and other changes in the utilities distribution system that would be necessary to provide essential services to the buildings included in Schedule C. (Secretary's N o t e — T h i s document is supported by appendices given data on gross square feet, net assignable square feet, and enrollment capacities and costs of the buildings on each campus. Copies of these appendices were filed with the Secretary for record.) APPROPRIATIONS FOR NONRECURRING EXPENDITURES (18) The Committee on Nonrecurring Appropriations, the Executive Vice-President and Provost, and the Vice-President and Comptroller recommend the following appropriations: From University General Reserve URBANA-CHAMPAIGN College of Liberal Arts and Sciences Department of Chemistry and Chemical Engineering, e q u i p m e n t . . . . $ 38 544 00 Department of Zoology, equipment 17 895 00 Renovation and remodeling for which funds are assigned to the Physical Plant Department: T o begin remodeling in the Natural History Building for the Departments of Botany, Geology, and Zoology 150 330 00 Total, Urbana-Champaign $206 769 00 CHICAGO CIRCLE Assignment to the Office of the Vice-President, to match funds for grants received from the United States Office of Education under Title V I of the Higher Education Act of 1965. $ 79 269 00 Renovation and remodeling for which funds are assigned to the Physical Plant Department: Remodeling in the Roosevelt Road Building (the former Central National Bank Building) for the Division of Physical Education 95 000 00 Total, Chicago Circle $174 269 00 Total, University General Reserve $381 038 00 From National Science Foundation URBANA-CHAMPAIGN Cost-of-Education Allowances College of Engineering Nuclear Engineering, upgrading of the Nuclear Reactor, to supplement a grant from the National Science Foundation $ 72 000 00 CHICAGO CIRCLE Renovation and remodeling for which funds are assigned to the Physical Plant Department: Remodeling in the Science and Engineering Laboratories for the Departments of Biological Sciences and Chemistry 53 000 00 Total, National Science Foundation Cost-of-Education Allowances $125 000 00 From Contract Research MEDICAL CENTER Reserve Renovation and remodeling for which funds are assigned to the Physical Plant Department: Remodeling in the Research Laboratory in the Sangamon Street Building (the former old Illinois Eye and E a r Infirmary) for the Departments of Medicine and Microbiology $210 000 00 Grand Total $716 038 00 I concur.
|