554

BOARD OF TRUSTEES

[June 20

Renovation and remodeling for which funds are assigned to the Physical Plant Department: Remodeling in Engineering Hall for the installation of a computer 24 900 00 Total for General Reserve 73 200 00 Grand Total $84 450 00 I concur. O n m o t i o n of M r . S w a i n , t h e s e a p p r o p r i a t i o n s w e r e m a d e b y t h e following vote: Aye, M r . Clement, M r . Grimes, M r . H a h n , M r . H u g h e s , M r . Johnston, M r . Jones, M r . P o g u e , M r . S w a i n ; no, n o n e ; absent, Governor Kerner, Mr. Page, Dr. Weatherly. CONTRACTS FOR CONSTRUCTION OF OPTICAL TELESCOPE BUILDING (12) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of the following contracts for construction of the Optical Telescope Building to be located approximately thirty-five miles southeast of Urbana-Champaign in Douglas County, the award in each case to the lowest bidder: General — Skoog Construction Company, Champaign Base bid $189 000 00 Additive alternates for: Assignment of other contracts to the general contractor 1 200 00 W o r k required to include installation of stand-by generator 860 00 Deductive alternate for substituting gravel drive and access road in lieu of asphalt paving 4 400 00 Subtotal $186 660 00 Electrical — Don Fowler, an individual doing business as Don Fowler Electric, State Line, Indiana Base bid 11 266 00 Additive alternate for provision of stand-by generator 4 990 00 Subtotal 16 256 00 Plumbing — David W. Reichard Plumbing & Heating Co., Inc., Urbana Base bid 6 050 00 Additive alternate for provision of stand-by generator 665 00 Subtotal 6 715 00 Ventilating — W . L. Rogers, an individual doing business as CoolRite Refrigeration, Urbana Base bid ..'. 5 945 00 Additive alternate for provision of stand-by generator 309 00 Subtotal 6 254 00 Total $215 885 00 It is further recommended that all contracts other than the general contract be assigned to the contractor for general work, making the total of the contract $215,885; and that an agreement be entered into with Skoog Construction Company, Champaign, for the assignment of these other contracts for $1,200. This amount is included in the $215,885 contract price, and is the amount bid by that firm for service charge for the supervision of other contracts assigned to the general contractor. It is also recommended that the Board authorize the assignment of $26,000 from Urbana-Champaign Contract Research Reserve to supplement funds available from a grant from the National Science Foundation and an appropriation made by the Board of Trustees from Urbana-Champaign Contract Research Reserve on May 18, 1966.