EXTRACTED TEXT FROM PAGE:



2Z8

BOARD

OF TRUSTEES

[December 8

Now, therefore, be it and it hereby is resolved by The Board of Trustees of the University of Illinois, as follows : Section 1. That the Comptroller and the Secretary of The Board of Trustees of the University of Illinois be and they are hereby authorized to execute, acknowledge and deliver in the name and on behalf of this corporation an Instrument of Transfer of jurisdiction to the Illinois Building Authority transferring jurisdiction of the following described real estate : T h e South 164 feet 4 inches of the North 429 feet 8U inches of the East 80 feet 11 inches of the West 92 feet 7 inches of that part of Blocks 3 and 4 of Codwise's Subdivision of the West Vi of the Southeast Vi of Section 18, Township 39 North, Range 14 East of the Third Principal Meridian (except 1 chain and 37 links all along the West side thereof) lying South of the South Line of West Polk Street and East of the East line of South Wolcott Avenue, all in the City of Chicago, Cook County, Illinois being the site upon which the Illinois Building Authority is to construct said Medical Sciences Addition.

On motion of Mr. Swain, the foregoing resolution was adopted by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Johnston, Governor Kerner, Mr. Page.

ALLOCATION OF FUNDS FOR CONSTRUCTION OF A HANGAR AT WILLARD AIRPORT (17) Because of limited hangar facilities, four University aircraft, two of the Twin Beach aircraft and both of the DC-3 aircraft, continue to be exposed to the weather at the University of Illinois-Willard Airport. Therefore, it is proposed that a new hangar of approximately 140 feet by 140 feet be constructed at an estimated cost of $150,000. Provision of the new facility will result in elimination of weather damage, lower depreciation costs, lower inspection costs, and better service. It is recommended that this facility be constructed out of reserves at the Airport, with the funds being replaced by future earnings from the Airport operations.

On motion of Mr. Swain, this recommendation was approved.

AWARD OF CONTRACT BY T H E ATHLETIC ASSOCIATION FOR PRESS BOX AT MEMORIAL STADIUM, URBANA CAMPUS (18) The Board of Directors of the Athletic Association has approved award of a contract for $508,298 to Kuhne-Simmons Co., Inc., Champaign, the lowest bidder, for the construction of a press box at Memorial Stadium. Funds for the project will be provided by the Athletic Association. In accordance with the By-laws of the Athletic Association, the Comptroller has approved this contract, and it is reported to the Board for record. O n m o t i o n of M r . S w a i n , t h i s r e p o r t w a s a c c e p t e d f o r r e c o r d . PURCHASES (19) The President submitted, with his concurrence, a list of purchases recommended by the Director of Purchases and the Vice-President and Comptroller. The list of purchases recommended for Board approval was presented in two categories: purchases from appropriated funds (i.e., from state appropriations to the University) and purchases from institutional funds. The latter term designates funds received by the University under contracts with the United States government, contracts with private corporations and other organizations, funds from foundation grants, and grants from corporations and other donors, and University revolving funds authorized by law. The total amounts of these purchases were : From Appropriated Funds $ 62 578 04 From Institutional Funds 249 012 18 Grand Total $311 590 22 A complete list of the purchases recommended, with supporting information, including the quotations received, was sent to each member of the Board in advance