EXTRACTED TEXT FROM PAGE:



276

BOARD or TRUSTEES

[December 8

Total Estimated Fee Payments J882 00 280 00 974 50

Per Cent Per Cent Per Cent for for for SubMaterial Labor contracts General — Dean Evans Co., Champaign. . 10 26 10 Electrical — Emric Electric, Inc., Champaign 10 23 0 Plumbing — Wren C. & Willis H. Thomas, a partnership doing business as Thomas Plumbing & Heating Co., Urbana 20 39 5 Heating, Piping, Refrigeration, and Automatic Temperature Control Systems — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 22 26 5 Ventilation and Distribution Systems for Conditioned Air — W. L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana 22 26 5

81100

808 00

Since W . L. Rogers, an individual doing business as Cool-Rite Refrigeration, Urbana, is the lowest bidder with identical bids for heating, piping, refrigeration, and automatic temperature control systems work and ventilation and distribution systems for conditioned air work, it is also recommended that these two awards be combined into a single contract in lieu of separate contracts. The estimated total cost of the work is $27,030. Funds are available from an appropriation approved by the Board of Trustees on October 13, 1966. I concur.

On motion of Mr. Hughes, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Johnston, Governor Kerner, Mr. Page.

CONTRACT FOR ELECTRICAL INSTALLATION WORK OF CABLE AND SWITCHGEAR EQUIPMENT AT ABBOTT POWER PLANT, URBANA (15) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of a contract for $107,963 to Aldridge Electric, Inc., Lake Forest, the lowest bidder, for installation of high-voltage power cable and switchgear equipment at the Abbott Power Plant. Funds are available in state capital appropriations to the University for additions to the Power Plant and extension of utilities, and have been released. I concur.

On motion of Mr. Williamson, this contract was awarded by the following vote: Aye, Mr. Clement, Mr. Dilliard, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none; absent, Mr. Johnston, Governor Kerner, Mr. Page.

REQUEST TO THE ILLINOIS BUILDING AUTHORITY TO CONSTRUCT THE MEDICAL SCIENCES A D D I T I O N , MEDICAL CENTER (16) On October 25, 1966, the Illinois Building Authority received bids for all work for the construction of the Medical Sciences Addition, Phase II, building at the Medical Center campus. The lowest bidder was Joseph J. Duffy Co., Chicago, with a bid of $1,584,404, this sum being the total of the base bid and nineteen recommended alternates. Six other proposals were received with bids (the base bid plus recommended alternates) from $1,649,500 to $1,831,119. The lowest bidder is considered qualified for this project. T h e project is one of those which the Board of Trustees at its meeting on September 22, 1965, requested the Illinois Building Authority to provide. The Authority will finance construction and lease the facilities to the University for rental payments for which state appropriations are available. The University will transfer jurisdiction of the land on which the project will be constructed to the Authority. The Director of the Physical Plant and the Vice-President and Comptroller