UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 1118]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1118 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1066

Type of Space Stacks and materials space Reader and user space Staff and service space Total

BOARD OF TRUSTEES

[June 19

Net Assignable Square Feet 34 038 36 000 14 010 84 048

The Library is planned to provide informational services to the following projected campus population in 1980: Students (Headcount) Professional students 3 877 Postgraduate students 370 Graduate students 1 159 Total Students 5 406

Staff

Academic staff 1 370 Nonacademic staff 5 170 Total Staff 6 S40 The building has been planned to accommodate the following: Book and non-book materials 308 380 Volumes Reader and user capacity 1 200 Staff 49 Upon completion of the Library Building, all existing library space will be vacated and reassigned. Approximately 15,000 net square feet of space adjacent to the College of Medicine will be reassigned to that College. Temporary space occupied by the Library in the old Chicago Mini Union Building will be reassigned for administrative offices. Other Capital Projects Movable Equipment $4 665 000 1967-69 buildings ($3,770,000). Funds are requested to complete the equipping of buildings approved for construction during the 1967-69 biennium. Capital appropriations for the last biennium did not include movable-equipment allocations for approved buildings, except for funds required to match anticipated federal grants. The following figures summarize the movable-equipment funds requested for the 1967-69 buildings, with breakdowns showing the amounts needed in 1967-69 and in 1969-71: Total Cost Funded in Requested for of Movable 1967-69 Other 1969-71 Project Equipment Biennium Funding Biennium Dentistry, Phase I $2 260 000 $200 000 $2 060 000 $385'666 1 Nursing Building 950 000 35 000 530 000 Medical Research 640 000 Laboratory 680 000 40 000 540 000 Office Building 555 000 15 000 Total $4 445 000 $290 000 $385 000 $3 770 000 1969-71 buildings ($525,000). Funds are requested only to the extent needed to match anticipated federal grants for movable equipment for the College of Dentistry Building and the Library Building. The balance of the movable-equipment funds will not be needed until the 1971-73 biennium. The following figures show the total needed and the proposed distribution of funds for 1969-71 and 1971-73: Total Cost Deferred to Requested for of Movable 1971-73 1969-71 Project Equipment Biennium Biennium $125 000 Library ? 485 000 ? 360 000 400 000 Dentistry, Phase II 2 050 000 1 650 000 $525 000 Total $2 535 000 $2 010 000

1 $182,000 from federal funds plus $203,000 from Seventy-fourth General Assembly funds, reappropriated.