BOARD OF TRUSTEES

[June 17

percentages bid for contractors' fees for remodeling the meats commissary in Davenport Hall and slaughter house facilities in the Stock Pavilion at the UrbanaChampaign campus, the award in each case being to the low bidder. Estimated Per Cent Fee PayPer Cent Per Cent for ments and Total for for Subcon- Equipment Estimated Material Labor tracts Costs Payments General — Barber & DeAtley, Inc., U r b a n a . . . 2.9 24 25 $2 168 55 $ 1 1 4 1 8 55 Electrical — G. L. Wilsky, an individual, doing business as Downtown Electric, Urbana 16 26 0 60 80 340 80 Plumbing—Willis Thomas & W. C. Thomas, a partnership, doing business as Thomas Plumbing & Heating Co., U r b a n a . . 16 33 0 426 40 199140 Heating, Piping, Refrigeration & Automatic Temperature Control S y s t e m s — D a v i d W. Reichard Plumbing & Heating Co., Inc., Urbana 15 42 5 468 00 2 368 00 Funds for this work are available in an appropriation made by the Board of Trustees on April 15, 1970. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. O n m o t i o n of M r . S w a i n , t h e s e c o n t r a c t s w e r e a w a r d e d b y t h e following vote: Aye, M r . Clement, M r . H a h n , M r . H u g h e s , M r . Steger, M r . Swain, D r . W a l k e r ; no, n o n e ; absent, M r . Grimes, M r . Jones, Governor Ogilvie, M r . Page, M r . Stone. CONTRACT FOR CONSTRUCTION OF OUTDOOR FIRING RANGE FOR POLICE TRAINING INSTITUTE, DIVISION O F UNIVERSITY EXTENSION, URBANA (25) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contract based on percentages bid for contractors' fees for construction of an outdoor firing range for the Police Training Institute of the Division of University Extension at the Urbana-Champaign campus, the award being to the low bidder. Estimated Per Cent Fee PayPer Cent Per Cent for ments and Total for for Subcon- Equipment Estimated Material Labor tracts Costs Payments General — Barber & DeAtley, Inc., Urbana. .. 2.9 24 2 $7 755 00 $74 755 00 Funds for this work are available in an appropriation made by the Seventysixth General Assembly for the Police Training Institute. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Mr. Hahn, this contract was awarded by the following vote: Aye, Mr. Clement, Mr. Hahn, Mr. Hughes, Mr. Steger, Mr. Swain, Dr. Walker; no, none; absent, Mr. Grimes, Mr. Jones, Governor Ogilvie, Mr. Page, Mr. Stone.