950

BOARD OF TRUSTEES

[June 17

able, the options held by the University be exercised to renew the above contracts for elevator maintenance service for the Chicago Circle campus for Fiscal Year 1971, with the unit price adjustments as follows: Unit Cost Original Price for Contract Adjustments FY1971 Group A Reliance Elevator Co 537 800 00 53 071 25 $40 871 25 Group B & C Haughton Elevator Company, Div. of Reliance Electric Co., Toledo, Ohio 7 291 20 661 31 7 952 51 Group D Montgomery Elevator Co 1 344 00 107 23 1 451 23 Group £ Gregory Elev. Maint. Co 7 500 00 601 50 8 101 50 Group F Gallaher & Speck Group G Gallaher & Speck Total 4 200 00 343 89 4 543 89 4 414 07 567 334 45

4 080 00 334 07 562 215 20 55 119 25

Funds have been included in the proposed operating budget of the Physical Plant Department for FY1971.

On motion of Dr. Walker, this recommendation was approved by the following vote: Aye, Mr. Clement, Mr. Hahn, Mr. Hughes, Mr. Steger, Mr. Swain, Dr. Walker; no, none; absent, Mr. Grimes, Mr. Jones, Governor Ogilvie, Mr. Page, Mr. Stone.

CONTRACTS FOR CONTRACTORS' FEES FOR MINOR REMODELING A N D N E W C O N S T R U C T I O N , F Y I 9 7 1 , AT CHICAGO CIRCLE A N D MEDICAL CENTER (22) T h e President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts for minor building alterations, repairs, and new construction work for the period July 1,1970, through June 30, 1971, at the Chicago Circle and Medical Center campuses, the award in each case to be to the lowest bidder. Per Cent Per Cent Per Cent for for for Material Labor Contracts General — Erik A. Borg Company, S k o k i e . . . . 8 30 8 Electrical—-Gerson Electric Construction Co., Chicago 21 28 10 P l u m b i n g — G . F . Connelly Co., Inc., Chicago 8 % 31J^ 8% Heating, Refrigeration, and Temperature Control — The Nu-Way Contracting Corp.,

Chicago •.-•;•••.

1 0 3 5 5

Ventilation and Distribution Systems for Conditioned Air — Admiral Heating and Ventilating, Inc., Hillside 9 38 5 These contracts will be for work which does not justify the cost of preparing separate drawings and specifications and of separate bidding procedures on each project estimated to cost less than $25,000. T h e several contractors bid on percentages to be added to the actual cost of material, labor, and subcontracts, and the awards recommended are to the lowest bidders. The work will be done as ordered by the Physical Plant Department and will be paid for on the basis of the actual cost of each job plus contractors' fees. Sub-