Caption: Board of Trustees Minutes - 1970 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1970] UNIVERSITY OF ILLINOIS 921 Deduct Alternate No. 5 Deduct Alternote No. 6 Base Bid General —- James Drew, an individual doing business as J. S. Drew Construction Co., Palatine $29 438 Plumbing —• The Nu-Way Contracting Corp., Chicago 20 443 Heating, Air Conditioning, Process Piping, and Temperature Control — S . J . Reynolds Co., Inc., Cicero 19 716 Ventilation—Moto Heating, Ventilating, Air Conditioning Corporation, Chicago 1390 Electrical—-Midwest Interstate Electrical Construction Co., Chicago 18 616 Total Deduct Alternate No. 2 Deduct Alternote No. 3 Deduct Alternote No. 4 Total $1000 $1350 $1000 $1250 $ 300 $24 538 100 20 343 1 600 ... 2 350 ... 6 400 9 366 1390 ... 5 353 ... 5 872 492 6 899 $62 536 It is further recommended that all contracts other than the contract for the general work be assigned to the contractor for the general work, making the total of its contract $62,536, and that an agreement be entered into with the J. S. Drew Construction Co. for assignment of the other contracts. The amount bid by J. S. Drew Construction Co. for the supervision of the other contracts assigned to the general contractor is included in the base bid for general work. Funds for this work are available in state capital appropriations to the University and have been released by the Governor. Submitted herewith is the schedule of bids received, a copy of which is being filed with Secretary of the Board for record. On motion of Mr. Jones, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Hahn, Mr. Hughes, Mr. Jones, Mr. Stone, Dr. Walker; no, none; absent, Mr. Grimes, Governor Ogilvie, Mr. Page, Mr. Steger, Mr. Swain. REVISION IN CONTRACT FOR GAS SERVICE FOR THE CIVIL ENGINEERING BUILDING, URBANA (26) The Board of Trustees at its meeting on May 16, 1967, authorized execution of an agreement with Illinois Power Company for gas service for the Civil Engineering Building Complex at the Urbana-Champaign campus, at the Standard Utility Service Classification Rate 62 with Riders A, C, and CC. On December 20, 1967, the Board of Trustees approved a revision in this contract to Classification Rate 52 with Riders A, C, and CC until adjustments in the system could be completed which would make a return to Rate 62 economical. Adjustments in the system have now been completed, and it will now be desirable to return to Classification Rate 62. Accordingly, the President of the University, with the concurrence of appropriate administrative officers, recommends that authorization be given to enter into an agreement with the Illinois Power Company for gas service at the Civil Engineering Building at the Urbana-Champaign campus at the Standard Utility Service Classification Rate 62 with Riders A, C, and CC.
| |