1969]

UNIVERSITY OF ILLINOIS

695

Urbana-Champaign General Reserve Renovation and remodeling for which funds are assigned to the Department of Plant and Services: Remodeling of Room 158 Natural History Building for the Department of Geology $ 32 480 Remodeling of dance floor in Krannert Center for the Performing Arts 16 000 Total $ 48 480 T h e Chancellors of the respective campuses recommend reappropriation of the following balances remaining in projects previously approved by the Board of Trustees but not completed by the close of the lapse period on September 30: Chicago Circle General Reserve University Hall seventh floor remodeling $ 13 588 21 Medical Center General Reserve University of Illinois Hospital dietary dishwashing complex $ 13 887 14 University of Illinois Hospital neurology equipment 19 575 00 University of Illinois Hospital radiology equipment 13 750 00 Office of Space Utilization remodeling 14 165 17 University of Illinois Hospital radiology cobalt therapy equipment.. 66 863 13 Obstetrics and Gynecology laboratory remodeling 27 255 23 University of Illinois Hospital air conditioning 225 266 25 Betatron area remodeling 14 496 68 Library air conditioning 14 602 59 Total $409 861 19 Urbana-Champaign General Reserve Administrative Offices equipment $ 17 227 88 Library equipment Commerce and Special Languages Library 36 652 54 Altgeld Hall air conditioning and relighting 13 766 17 Engineering Hall remodeling 16 534 22 McKinley Hospital remodeling, Mental Health Division 13 664 36 Natural History Building remodeling, Geology 14 446 13 Television Studio addition 61 504 89 Total $173 796 19 The Executive Vice President and Provost and the Vice President and Comptroller concur. I recommend approval. O n m o t i o n of M r . S w a i n , t h e s e a p p r o p r i a t i o n s w e r e m a d e b y t h e following vote: A y e , M r . Clement, M r . Grimes, M r . H a h n , M r .

Hughes, Mr. Steger, Mr. Swain; no, none; absent, Mr. Jones, Governor Ogilvie, Mr. Page, Mr. Stone.

CONTRACTS FOR MECHANICAL WORK, RACINE AVENUE BUILDING, CHICAGO CIRCLE (11) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following contracts for installation and extension of heating and cooling systems for occupancy of additional areas in the Racine Avenue Building at the Chicago Circle campus, the award in each case being to the low base bidder : Plumbing and Drainage — Peter H . Smith Company, Chicago $ 3 880 Heating, Refrigeration and Temperature Controls — Advance Heating and Air Conditioning Corporation, Chicago 96 040 Ventilation and Air Conditioning—Reliable Sheet Metal Works, Inc., Elk Grove Village 39 362 Total $139 282 Funds are available in state capital appropriations to the University and have been released by the Governor.