UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1970 [PAGE 402]

Caption: Board of Trustees Minutes - 1970
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 402 of 1077] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



402

BOARD OF TRUSTEES

[May 21

Urbana-Champaign New Contracts

With Whom United States Air Force: F29601-69-C-0071 F 33615-69-C-1334 United States Department of Health, Education, and Welfare O EC-0-9-000003-2495 (013) United States Department of Labor; Bureau of Labor Statistics BLS-69-1 Manpower Administration 81-15-69-07 United States Department of Transportation, Federal Railroad Administration DOT-FR-9-0033 United States Navy N-00019-69-C-0289 Total With Whom National Aeronautics and Space Administration NGL-14-005-074 Union Carbide Corporation, Nuclear Division United States Air Force AF 30(602)-4144 United States Army: DA-49-193-MD-2909 DADA-17-67-C-7062 United States Atomic Energy Commission: AT(ll-l)-890 AT(11-1)-1199 United States Navy: N-00014-67-A-0305-0011 Nonr-1834(36) Total Purpose Silicate treatment to inhibit corrosion of hot, potable water systems Investigation of thin platelet semiconductor lasers and electron-hole-lattice interactions in semiconductor lasers CIC cooperative summer institute in Slavic languages and area studies Amount to be Paid to the University $ 39 976 29 911 25 397

Effectiveness of various forms and procedures for collecting expenditure data from consumers Development of a model university human resources program Highway-railroad grade crossing safety

61 330 14 990

6 000

Factors controlling strength of composite structures $

39 940

217 544

Change Orders

Purpose Studies on auditory and vestibular end organs and brain stem nuclei Prestressed concrete pressure vessels for nuclear reactors Experimentation in parallel computation Determination of free bromine in water Disinfection of small quantities of drinking water Investigate the mechanism of radiation induced addition of tritium to carbon-carbon double bonds Studies of rainout of radioactivity in Illinois Solid state and surface state electronics of semiconductors as related to devices such as transistors and photo-detectors Factors in group interaction Amount to be Paid to the University $ 155 000

31 325

2 000 000

13 123 8 250

18 029 76 000 5 000 220 130

$2 526 857 A mount to be Paid by the University $ 12 9 6 5 12 000 300 000 000 000

With Whom Barber and DeAtley, Inc.

Cool-Rite Mechanical Contractors, Inc. Total Total, Urbana-Champaign

Purpose Cost-plus contract — general work: Agronomy Seed House Electrical Engineering Research Laboratory Engineering Hall Foreign Languages Building 1107 W. Green Street, Urbana Cost-plus contract — minor remodeling and new construction: Engineering Research Laboratory

6 32S

Amount to be paid to the University: Urbana-Champaign. . . .

Summary

$ 50 625 12 795 026 32 744 401