UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1972 [PAGE 706]

Caption: Board of Trustees Minutes - 1972
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 706 of 752] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNiVE*sft*y br itti»ois

Engineering, cont'd TKjdgjet, summer quarter, 206, 557 eurneuta, revision, 3S6 degrees, Bachelor of Science, revision, 3*56 conferral, 333, 334 66ft 670, 671 Engineering, CotTege of (Urbana), currieala, computer science, established, 381 electrical engineering, revision, 535 electrical engineering; and* computer science, revision, 38Z degrees. Bachelor of Science, computer science, approved, 381 conferred, 92, 114, 226, 336, 408, 433, 541, 673 Engineering Library (Urbana1), contract, consultant services, 257 inclusion in pilot program for experimentation on the design and construction of buildings, 217 Engineering Research Laboratory (Urbana), contract, piping, change, 190 refrigeration, change, 88 Engineering servicest contract, Champaign, Construction Engineering Research Laboratory, Phase I, 536 Chicago Circle, parking structure, testing and inspection services, 274 Utilities Building Addition, Phase IV, 325 Medical Center, air conditioning, renewed, 428 Dentistry Building, College of, Phase II, assignment to Illinois Building Authority, 471 steam line extension, 598 Dentistry-Medicine-Pharmacy Building, First Unit, air conditioning, increase, 142 Second Unit, air conditioning, increase, 142 General Hospital Building, air conditioning, increase, 142 Hospital Addition Building, air conditioning, increase, 142 Library of Medical Sciences, assignment to Illinois Building Authority, Neuropsychiatric Institute Building, air conditioning, increase, 142 piping, 105 Urbana, Abbott Power Plant, waste water treatment, 598 Airport, University of Illinois—Willard, Airport Master Plan study, 599 chilled water system, extension of, 22 electrical system, extension of, 22 Law Building Addition, renewed, 126 Medical Sciences Building, assignment to Illinois Building Authority, 471 underground utilities tunnel, extension, electrical engineering, 598 mechanical engineering, 598 sewer system, extension of, 22 Speech and Hearing Clinic, assignment to Illinois Building Authority, 471 increase, 395 underground utilities tnnnel, extension, electrical engineering* 598 mechanical engineering, 598 steam system, extension of, 22 water system, extension of, 22 Engle, Patricia Lee, appointment, 440 English, Department of (Chicago Circle), budget, summer quarter, 208, 559 contract, supervisors of student teachers, 83 faculty members, litigation, suit regarding notices of nonreappointment, employment of special counsel, authorization, 458 head of department, appointment, 489 English, Department of (Urbana), budget, summer session, 170, 323 head of department, appointment, 268

471

(ffl

English as * Second' Larigtntge, Deparfttenf of (Urbana), budget, summer session, 522 Enrollment, concurrent, agreement between Chicago Circle and City Colleges of Chicago, report, 258 Entomology, Department of (Urbana), budget, summer session, 171, 523 Entomology Laboratory (Urbana), See also Environ mental Entomology Field Laboratory name, changed from Environmental Entomology Field Laboratory, 423 Environmental Affairs, coordination, assigned to Office of Aeademie development and Coordination, 586 Environmental Entomology Field Laboratory (Urbana), See also EntomttJogy Laboratory contract, general, change, 284 heating, change, 88 refrigeration, change, 88 remodeling, general* change, 109 name, changed to Entomology Laboratory, 425 Environmental Pollution Research Ponds (Urbana), See also Aquatic Research Field Laboratory name, changed to Aquatic Research Field Laboratory, 425 Environmental Protection Agency, contract, 401, 538, 635 suit, pollution of Boneyard Creek, employment of special counsel, authorization, 308 Water Quality Office, contract, 373 Environmental Research Laboratory (Urbana), See also Sanitary Engineering Laboratory contract, plumbing, change, 190 name, changed from Sanitary Engineering Laboratory, 104 Environmental Sciences Program (Urbana), offices and laboratories, space, lease, 106 Environmental Studies, University-wide Coordinating Council for, established, 468 functions, 468 Environmental Studies Institute (Urbana), established, 467 Enyeart, R. E., appointment, 652 Erbe, W. W., appointment, 211, 562 Erickson, John E., appointment, 163, 515 leave of absence, 568 Erickson, John Edward, appointment, 521 Erickson, Joan G., appointment, 527 leave of absence, 573 Erie City Energy Division, Zurn Industries, Inc., contract, 300 Eron, L. D., appointment, 211, 561 Eubanks, R. A., appointment, 164, 516 Evanich, M. J., appointment, 440 Evans, F. B., appointment, 177 Evans, J. F., leave of absence, 566 Evans, R. L., appointment, 236 authority to withdraw Office for Family Practice Medical Service Plan funds, 633 Evans, Dean, Company, contract, 80, 81, 219 change, 29, 88, 109, 128, 148, 190, 222, 284, 304, 330, 374, 476, 664 Evans Hall (Urbana), Revenue Bond Series of 1952, payment, insufficient funds, supplementation of revenues with student tuition, 368 Everingharo, J. W., appointment, 392 Everly, J. C., leave of absence, 239 Evers, B. W., member of University Citizens Committee,530 Evertts, Eldonna, appointment, 162, 515 Ewer, Phyllis A., appointment, 391 Ewing, B. B., leave of absence, 241 Ewing, T. J., appointment, 175 Ewing, W., appointment, 522 Ewing, Plumbing, Inc., contract, 300, 630