UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1972 [PAGE 697]

Caption: Board of Trustees Minutes - 1972
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 697 of 752] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



688

BOARD O F T R U S T E E S Construction work, cont'd steam pit # 5, waterproofing, change, 475 Urbana, Abbott Power Plant, improvements, 219, 445 Agriculture Services Building, warehouse unit addition, change, 284 Architecture Building, tuckpointing, change, 190 Assembly Hall, storage building, change, 431 Auditorium, roof repairs, change, 539 Beef t Research Farm, concrete oxidation ditch, change, 664 brooder-rearing house, change, 374 Burrill Hall, remodeling, change, 284 Burrill Hall Building Addition, 184 cage layer house, change, 330 Central Food Stores, remodeling, roof repairs, change, 374 Central Receiving Warehouse, Old, remodeling, 19 Colonel Wolfe School, repairs, change, 664 Commerce Building (West), change, 88 Coordinated Science Laboratory, remodeling, change, 222 Davenport Hall, change, 88 remodeling, change, 603 driver training site, metal storage and office building, change, 403, 431 East Chemistry Building, change, 88 roof repairs, change, 374 East Student Parking Compound, expansion, change, 664 storm stewer installation, change, 374 Education Building, change, 128 windows, change, 374 Electrical Engineering Research Laboratory, roof repairs, change, 330 Environmental Entomology Field Laboratory, change, 284 remodeling, change, 109 Fine and Applied Arts Building, remodeling, 148 windows, change, 284 Freer Gymnasium, remodeling, change, 284 Illiac IV, change, 109 Krannert Center for the Performing Arts, roof repairs, change, 190 Levis Faculty Center, 92 Library, repairs, change, 664 Materials Research Laboratory, change, 128 remodeling, 80 McKinlev Health Center, power unit, stand-by, 183 Mechanical Engineering Laboratory, roof repairs, change, 284 minor remodeling and new construction, 324 Natural History Building, remodeling, change, 109 repairs, change, 330 Natural Resources Building, repairs, change, 450 Nevada Street, property at 1001 West, remodeling, change, 330 Noyes Laboratory, repairs, change, 374 roof repairs, change, 374 parking lot, Fourth Street and Peabody Drive, 369 Physiology Research Laboratory Addition. 274 Police Training Institute, firing range, change, 127 Phase I I , 218 Race Street, property at 129 North, change, 88 Rehabilitation-Education Center, change. 128

Consolidated Telephone Company, easement, Douglas County, Prairie Observatory, 279 Construction Engineering Research Laboratory (Champaign), Phase I, contract, architectural services, 536 engineering services, 536 lease, modification, 536 Construction funds, designation of Madison Bank and Trust Company, Chicago, as depositary, 188 investment, report, 30, 52, 110, 192, 332, 405, 607, 608, 609, 610, 667 Construction management, contract. Medical Center, Library of the Health Sciences, 637 Construction matters, authority of Executive Committee to act, 23, 371 Construction work, general, contract, Chicago Circle, Distribution Building, parking facilities, change, 189 Education and Communications Building, driveways, 299 increase, 104, 185 sidewalks, 299 minor remodeling and new construction, 323, 661 parking facilities, change, 448 parking structure, 145 increase, 273, 368 parking structure No. 1, change, 475 Phase I I I site improvements, 299 Physical Education Building, driveways, 76 fencing, change, 282 playing fields, 76 sidewalks, 76 Woodworth, James, Prairie Preserve, interpretation center, 77 parking area, change, 372 Medical Center, Buildings Nos. 910, 950, and 935, tuckpointing, change, 283 Dentistry-Medicine-Pharmacy Building, First Unit, remodeling, 147 Second Unit, remodeling, 323 Drug and Horticultural Experiment Station, Extractor Building, change, 372 Farm Facility Addition, change, 663 Medical Research Laboratory Farm Facility, 78 General Hospital Building, remodeling, 80, 300, 596, 631, 660 Hospital Addition Building, air conditioning, 17 alteration, change, 663 remodeling, 79, 105, 255 change, 190 Illinois Eye and Ear Infirmary, New Ocular Laboratory, general, change, 190 remodeling, 141 change, 222 Illinois Surgical Institute, remodeling, 630 Laundry Building, repairs, change, 602 Library of the Health Sciences, authority to award contracts, 668 authority to u«e phased construction, request, 637 Medical Research Laboratory, remodeling, change, 190 Medical Research Laboratory Addition, change, 18 increase, 111 minor remodeling and new construction. 323, 661 Nursing Building, College of, change, 663 parking facilities, 18 Pharmacy Building, College of, remodeling, 77, 141 roofingj change, 222 roof repairs, change, 283, 500