UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1972 [PAGE 694]

Caption: Board of Trustees Minutes - 1972
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 694 of 752] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Champaign, City of, contract, 476 easement, Armory Avenue, sanitary sewer, 186 litigation instituted by Illinois Environmental Protection Agency, joint appeal with University, employment of special counsel, authorization, 435 street improvements for First Street, University participation, agreement, 599 suit, pollution of Boneyard Creek, employment of special counsel, authorization, 308 Champaign A & K Insulation Company, contract, 81, 445 Champaign Asphalt Company, contract, 369 Champaign County, federal surplus property, Rantoul, Chanute Radio Beacon Annex, acquisition, 386 Champaign-Urbana, Sanitary District, See Urbana and Champaign Sanitary District Chan, G. E., appointment, 421 Chancellor (Chicago Circle), appointment, 312 resignation, announcement, 91 Chancellor (Medical Center), Hospital, University, responsibilities, 138 Chancellor (Urbana), acting, appointment, 487 residence, operation assumed by University, 217 visit to University overseas programs, 429 Chancellor's Office (Chicago Circle), budget, summer quarter, 204, 555 Chancellor's Office (Urbana), Library Science, Graduate School of, transfer of administrative responsibility to chancellor, 267 Chandler, D,, appointment, 46 Chandler, H. S., appointment, 173 leave of absence, 244 Chandran, Judith U., undergraduate instructional award, 215 Chang, S., leave of absence, 569 Chanute Radio Beacon Annex (Rantoul), acquisition, 386 Chao, B. T., appointment, 165, 517 Chapdu, R. E., appointment, 171 Chaplan, Margaret A., appointment, 441 Chapman and Cutler, bonds, IntramuralPhysical Education Building (Urbana), 281 Charak, L,, appointment, 207 Charlier, Patricia S., leave of absence, 247 Charlston, R. H., appointment, 208 Charlton, W. J., member of University Citizens Committee, 178 Chasteen, Mrs. L., member of advisory committee, 352 Chatterton, R. T., Jr., appointment, 101 Chemical Engineering (Urbana), curriculum, revision, 272 Chemical Engineering, Department of (Urbana), head of department, appointment, 71 Chemical Sciences, School of (Urbana), budget, summer session, 175, 527 curriculum, chemical engineering, revision, 272 director, appointment, 70 Environmental Sciences Program, offices and laboratories, space, lease, 106 Chemistry, Department of (Chicago Circle), budget, summer quarter, 208, 558 Doctor of Arts degree, approved, 358 Chemistry, Department of (Medical Center), See also Medicinal Chemistry, Department of name, changed to Medicinal Chemistry, Department of, 366 Chemistry, Department of (Urbana), head of department, appointment. 70 Chemistry and Chemical Engineering, Department of (Urbana), major, biochemistry, approved, 14 Chen, Joyce T., appointment, 589

685

Chen, K„ leave of absence, 244 Cheng, C , appointment, 46 Chterrington, D, J., appointment, 161 undergraduate instructional award, 215, 620 special, 443 Cheska, Alyce T., appointment, 176 Cheston. W. B., appointment, 312 introduction, 340 Chian, E. S. K., appointment, 422, 516 Chicago, City of, Board of Education, contract, 82 Board of Health, contract, 449 change, 147 City Colleges of Chicago, concurrent enrollment agreement with Chicago Circle, report, 258 Committee on Urban Opportunity, contract, 189 contract, 147, 663 Department of Water and Sewers, contract, 401 lighting improvements for Congress Parkway, University participation, agreement, 273 Chicago Bridge & Iron Company, contract, 185 Chicago Circle, Business Administration, College of, reorganization, departments established, 216 Chancellor, appointment, 312 Resignation, announcement, 91 concurrent enrollment agreement with City Colleges of Chicago, report, 258 contract, bird control, 497 building equipment automation system, Phase I, installation, 496 Phase IA, installation, 668 electrical, change, 108 fuel oil, 90 change, 90 landscaping, 48, 369, 662 lawn sprinkler systems, 76, 300, 536 lighting fixtures, cleaning services, 427, 660 minor repairs, 427, 660 relamping, 427, 660 long-range campus planning studies, architectural services, renewed, 22 minor remodeling and new construction, air conditioning. 323, 661 reassignment, 427 electrical, 323, 661 general, 323, 661 heating, 323, 661 plumbing, 323, 661 refrigeration, 323, 661 temperature control, 323, 661 ventilation, 323, 661 reassignment, 427 parking facilities, general, change, 448 parking structure, architectural services, testing and inspection services, 274 electrical, 145 engineering services, testing and inspection services, 274 general, 145 increase, 273, 368 plumbing, 145 parking structure No. 1, general, change, 475 remodeling, architectural services, 105 site development, 48, 369, 662 site improvements, Phase III, drainage, 299 general, 299 plumbing, 299 snow removal, 48, 369, 662 degrees, Doctor of Arts, chemistry, approved, 358 Doctor of Philosophy, information systems and bioengineering, approved, 249 political science, approved, 624