Caption: Board of Trustees Minutes - 1972 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
190 BOARD OF T R U S T E E S [January 20 Amount to be Paid to the University $ 24 590 29 913 54 503 Change Orders With Whom United States Army DADA 17-69-C-9110 DADA 17-70-C-0004 Total Purpose Antiradiation drugs—synthesis of mercaptoamidines Comparison of hemoglobin solution versus albumin solution in treatment of hemorrhagic shock in the baboon $ With Whom Erik A. Borg Company Nu-Way Contracting Total Purpose Cost plus contract — general work: Remodel emergency service suite, Hospital Addition Subdivide room 119, Medical Research Laboratory New Ocular Laboratory, Eye and Ear Infirmary Cost plus contract—heating, process piping and temperature control work: Rooms 200 A and B, First Unit Dentistry-Medicine-Pharmacy building Amount to be Paid by the University $ 7 147 6 677 7 330 6 010 27 164 Urbana-Champaign New Contracts Purpose Ionospheric research on wave propagation and earth satellite radio emission studies Study of selected radiation and propagation problems to antennas and probes in plasmas Rocket studies of the lower ionosphere Study of the effect of income payments to reduce or increase natality Use of parallel processing in large problems, particularly the oil industry With Whom National Aeronautics and Space Administration: NGR-14-005-002 NGR-14-005-009 Amount to be Paid to the University $ 85 000 50 000 260 000 34 843 32 380 10 000 250 000 $ 722 223 NGR-14-005-013 National Institutes of Health Pan American Petroleum Corporation United States Army Detection of pulsed radiation at 10.6 microns DA ARO-D-31-124-71-G-39 United States Atomic Development of picture processing methods Energy Commission AT(11-1)2118 Change Orders Total With Whom United States Atomic Energy Commission: AT(11-1)1195 AT(11-1)1469 United States Department of Health, Education and Welfare OEC-3-6-051182-1634 Total With Whom Dean Evans Company Purpose Amount to be Paid to the University $ 100 000 570 000 8 578 Elementary particle interactions in the high energy region Computer systems research Two year program of string instruction Change Orders Purpose Cost plus contract — general work: Architecture building tuckpointing Krannert Center for the Performing Arts roofing repairs Cost plus contract — piping work: Abbott Power Plant Allerton House Engineering Research Laboratory Cost plus contract — plumbing work: Environmental Research Laboratory * 678 578 Amount to be Paid by the University $ 5 065 5 552 5 500 5 556 8 250 * 5 200 35 123 Reliable Plumbing and Heating Company Thomas Plumbing and Heating Company Total
|