1970]

UNIVERSITY OF ILLINOIS

141

This motion was adopted by the following vote: Aye, Mr. Qement, Mr. Hahn, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Dr. Walker; no, none; absent, Mr. Grimes, Governor Ogilvie, Mr. Page, Mr. Steger.

CONTRACTS FOR REMODELING IN ILLINOIS EYE AND EAR INFIRMARY OF T H E UNIVERSITY OF ILLINOIS HOSPITAL, MEDICAL CENTER

(7) The President of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling East Corridor Waiting Room 2.187, of the Illinois Eye and Ear Infirmary of the University of Illinois Hospital at the Medical Center campus, the award in each case being to the low base bidder: General — Mutual Contracting Company, Chicago $ 21 Oil Plumbing — Charles Gillespie, an individual doing business as Jefferson Park Plumbing, Chicago 3 949 Ventilation Work — Narowetz Heating and Ventilating Company, Melrose Park 3 005 Electrical Work — Tri-City Electric Company (Illinois), Chicago 2 571 Total $ 30 536 It is further recommended that all contracts other than the contract for the general work be assigned to the contractor for the general work, making the total of its contract $30,536, and that an agreement be entered into with Mutual Contracting Company for assignment of the other contracts. The amount bid by Mutual Contracting Company for the supervision of the other contracts assigned to the general contractor is included in the base bid for general work. Funds for this work are available from the University Hospital Income account. Submitted herewith is a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record.

On motion of Mr. Swain, these contracts were awarded by the following vote: Aye, Mr. Clement, Mr. Hahn, Mr. Hughes, Mr. Jones, Mr. Pogue, Mr. Swain, Dr. Walker; no, none; absent, Mr. Grimes, Governor Ogilvie, Mr. Page, Mr. Steger.

CONTRACTS FOR REMODELING IN COLLEGE OF PHARMACY BUILDING, MEDICAL CENTER

(8) The President of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling Illustration Studios in the College of Pharmacy Building at the Medical Center campus, the award in each case being to the low base bidder: General — Simpson Construction Co., Chicago $ 23 190 Plumbing—Charles Gillespie, an individual doing business as Jefferson Park Plumbing, Chicago 5 989 Heating, Air Conditioning, Process Piping, and Temperature Control — H. Gersten, an individual doing business as Heatmasters, Chicago. 9 248 Ventilation — Moto Heating, Ventilating, Air Conditioning Corporation, Chicago 6 950 Pipe Covering and Insulation -— Illinois Insulation and Construction Company, Chicago 3 095 Electrical — Tri-City Electric Company (Illinois), Chicago 20 447 Total $ 68 919 It is further recommended that all contracts other than the contract for the general work be assigned to the contractor for the general work, making the total of its contract $68,919, and that an agreement be entered into with the Simpson Construction Co. for assignment of the other contracts. The amount bid by Simpson Construction Co. for the supervision of the other contracts assigned to the general contractor is included in the base bid for general work.