EXTRACTED TEXT FROM PAGE:



1972]

UNIVERSITY OF ILLINOIS

77

instruction to a cadre of ten medical students, each of whom will work in the center for one-half day at a time, twice each week during the three years that they attend Rock ford School of Medicine. The initial lease period is November 1, 1972, provided the space is available for occupancy at that time, through June 30, 1973, with options to renew annually for three (3) additional years through June 30, 1976, a total period of forty-four (44) months. The basic rental is $3,478.00 per year. Remodeling done at the request of the University will total $32,518.00, which sum is to be prorated across the entire term of the lease and the three (3) annual extensions as an additional annual rental.1 Based upon November 1, 1972, occupancy, the total annual rent will be $12,347.16. In the event the University does not exercise its options, the majority of the remodeling cost will not be reimbursed. The lessor is willing to assume this risk. Funds for the initial rental are available in the Medical Service Plan account of the Rockford School of Medicine. I concur.

On motion of Mr, Swain, this recommendation was approved by the following vote: Aye, Mr, Forsyth, Mr. Hahn, Mr, Howard, Mr, Hughes, Mr. Neal, Mr. Pogue, Mr, Steger, Mr. Swain; no, none; absent, Dr. Bakalis, Governor Ogilvie.

REQUEST TO ILLINOIS BUILDING AUTHORITY TO CONTRACT FOR CONSTRUCTION O F VETERINARY MEDICINE HOSPITAL BUILDINGS, URBANA

(27) The President of the University, with the concurrence of appropriate administrative officers, recommends that the Illinois Building Authority be requested to award the following contracts for construction of the Veterinary Medicine Hospital Buildings at the Urbana campus, the award in each case being to the low bidder on its base bid: General — Kuhne-Simmons Co., Inc., Champaign $4 373 000 Electrical — Downtown Electric, Urbana 689 025 Plumbing and Fire Protection — Blaise, Inc., Centralia S68 000 Temperature Control — Barber-Colman Company, Lincolnwood 123 900 Heating and Air Conditioning—Bellis-Hanleyt Inc., Chicago 822 800 Ventilating — R. H. Bishop Company, Champaign 748 368 Total $7 325 093 It is further recommended that the contracts for electrical, plumbing and fire protection, temperature control, heating and air conditioning, and ventilating work be assigned to the contractor for general work, making the total of his contract $7,325,<#3, and that an agreement be entered into with Kuhne-Simmons Co., Inc., Champaign, for the supervision of these contracts assigned to the general contractor. The fee for this assignment is included in the base bid for the general work. The Illinois Building Authority will provide interim financing for the construction of this project until responsibility for the project is transferred from the Illinois Building Authority in accordance with a schedule to be established by the Capital Development Board. The Seventy-seventh General Assembly has appropriated to The Board of Trustees of the University of Illinois from the Capital Development Bond Fund the necessary funds for this project, subject to release by the Governor. The plans and specifications comply with the requirements of the Facilities for the Handicapped Act. It is also recommended that the Comptroller and the Secretary of the Board of Trustees be authorized to execute such consents to or acceptances of assignments of contracts and to execute such other contractual documents with the Illinois Building Authority as may be necessary in conjunction with the transfer by the Illinois Building Authority of its responsibilities for the project and to execute

1 15asic rent is at the rate of $1-43 per square foot; basic rent plus additional rent to reimburse remodeling cost equals a fate of £5.OS per square foot. Average rental rates in Beividere run from $2.00 per square foot Jo $4.50. The total cost of $5.06 per square foot^ is considered reasonable because of the extensive remodeling being done for the University, which remodeling would not be usable except for medical education.