1942]

UNIVERSITY OF ILLINOIS

19

The Board of Trustees on May 16, 1942 (Minutes, page 889), allocated the sum of $190,200 for building changes, equipment, and installations necessary to develop a program of research and education in the influence of atmospheric environment on humans, including problems relating to aviation, submarine, and military medicine, and $15,000 of this was released for architectural and engineering studies. T h e Director of the Physical Plant Department recommended the following reallocation of funds from the State appropriation of $254,000 for remodeling of the Research and Educational Hospitals: A. Items for which funds have been expended or encumbered: 1. Health Service (Temporary) $ 175 2. Cold Laboratory—Third Floor 3 000 3. Architectural and Engineering Costs 15 000 4. Narcotics Lock Boxes 500 5. Atmospheric Research—4 & 7 bed Air-Conditioned Space 40 000* 6. Atmospheric Research—Engineering and Contingency 15 000* 7. Emergency Casualty Service .'. 4 000 8. Equipment—Dr. Allen 28 300 9. R. & E. Hospitals Elevator Work—Contract of Otis Elevator Company 1 606 10. R. & E. Hospitals Remodeling—Contract of Mueller Construction Company 44 783 Sub-total (152 454) B. Items not previously approved: 11. R. & E. Hospitals Remodeling Building Contingency 3 500 12. Install Booster Heater—Orthopaedic Building 150 13. Move and Install Dental Unit—Orthopaedic Building 275 14. Relocate Latmdiy Equipment 3 500 15. Fire Alarm and Emergency Lighting 22 000 16. Third Floor Center Laboratories 2 000 17. Refrigeration 3 400 18. Storage Space General Stores 7 500 Sub-total (42 325) 19. Humidifying T w o Operating Rooms 750 20. X-Ray Connections—Fourth Floor 1 000 21. Dark Room—Second Floor Center 800 22. Child Research Clinic—Second Floor Center 300 23. Acoustical Treatment of Hospital Corridor Ceilings 7 coo Sub-total (9 850) 24. General Contingency for Future Use 49 371 Total $254 000 O n m o t i o n of M r . J e n s e n , this reallocation of f u n d s w a s a p p r o v e d as r e c o m m e n d e d . AWARD OF CONTRACT FOR REPAIRS AND ALTERATIONS IN RESEARCH AND EDUCATIONAL HOSPITALS (10) T h e Physical Plant Department has secured the following base bids for alterations and repairs in the Research and Educational Hospitals: Mueller Construction Company $44 783 Person Construction Company 49 500 Gerhardt F . Meyne 47 063 Coath & Goss, Inc 57 010 John Gebhardt & Son 58 000 Thorp-Rogoff Company 53 486 On recommendation of the Director and with the concurrence of the President of the University, the Executive Committee of the Board approved the

*These items are a part of the $190,200 previously authorized for this project and provide for improvements which it is possible to make at this time. The remaining $135,200 has been reallocated in the above budget.