|
| |
Caption: Board of Trustees Minutes - 1940 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
I94O] UNIVERSITY OF ILLINOIS 985 Gregory Hall Change Order No. 4, contract with Economy Plumbing and Heating Company for plumbing. Omit extension of plumbing vent lines to tops of chimneys in accordance with quotation dated May 10, 1940—Deduct Change Order No. 18, contract with W . E. O'Neil Construction Company for General Work. 1. Furnish and apply three coats of paint to steel stairway and walls and ceiling at stairway No. 3 $ 46 77 2. Furnish and install 66 transom eyes at meeting rails of 4th floor windows. 40 00 3. Provide two coats of special photographic green paint to walls and ceilings of Room 311A 29 85 Total Additional Illini Union Building Change Order No. 9, contract with Phillips, Getschow Company for heating, ventilating, and air conditioning work. 1. Extend high pressure steam piping to container washroom, part of Space # 5 $ 25 00 2. Relocate cooler in Vegetable Room 35 00 Total Additional Change Order No. 8, contract with the Wadeford Electric Company for electrical work. Provide conduit raceways for future installation of public address in ballroom—Add Change Order No. 6, contract with English Brothers for general work. Omit wood cornice in Rooms M2, M3, and M4 in accordance with quotation dated 5/4/40—Deduct $274 40 Change aluminum acoustical tile to template as quoted in letter dated 5/13/40—Deduct 9324 Change south terrace steps from elliptical to rectangular—Deduct 155 00 Provide ventilating manhole at northeast corner of addition to Compressor Room as quoted in letter dated 4/29/40—Add 50 35 Net Deduction Change Order No. 9, contract with the Wadeford Electric Company for electrical work. 1. Change lighting outlets as indicated on revision, Drawing 173-D $ 46 00 2. Changes in conduit due to relocation of door to Room 302 13 4° 3. Changes in conduit due to relocation of partition in Room 437 8 40 Total Additional SUMMARY $ 40 15 $116 62 $ 60 00 $ 52 29 $472 29 $ 67 80 Total deductions Total additions Net Deduction $512 44 296 71 $215 73 On motion of Mr. Karraker, the action of the President of the University in approving these change orders was confirmed.
| |