1940]

UNIVERSITY OF ILLINOIS

783

Agency a revised budget, taking into account all funds from all sources which will be applied on the construction of this building. Accordingly, I recommend approval of the following reallocation of funds, the original assignments being shown for purposes of comparison: Original Proposed Expenses Allocation Allocation Preliminary Land and Right-of-way Construction $1 080 620 00 $1 066 706 60 Engineering 4500000 9450819 Legal and Administrative I 000 00 3 280 85 Interest 24 750 00 22 750 00 Miscellaneous 1 14 000 00 18 464 70 Total $1 166 270 00 $1 205 710 34 Fmtds Available Grant Loan University Appropriation Total $ 52482000 $ 52482000 621 450 00 656 000 00 20 000 00 24 890 34 $1 166 270 00 $1 205 710 34

On motion of Mr. Cleary, this allocation was approved.

CONTRACTS FOR ILL1NI UNION BUILDING (19) T h e Director of the Physical Plant Department submits the following schedule of bids received on the construction of the Illini Union Building:

B I D SCHEDULE—ILLINI U N I O N BUILDING LANDSCAPING, W A L K S , DRIVES, ENTRANCE Bidders Landscaping Swain Nelson & Sons Co., Glenview Hubert Hunsucker, 406 N. Prairie, Champaign Paving, Walks, Curbs, and Drives King & Petry, 411 S. Chestnut, Champaign General Paving Co., 30 E. John St., Champaign English Bros., 44 Main St., Champaign E. N. DeAtley, 1502 S. Race St., Urbana South Ground Floor Entrance English Bros., 44 Main St., Champaign King & Petry, 411 S. Chestnut, Champaign E. N. DeAtley, 1502 S. Race St., Urbana Base Bid $ 9 968 60 14 533 63 20 21 21 25 770 700 085 450 00 00 00 00 Alt. tl $283 56s 200 oo2 760 500 725 1 000 oo* 00* 00* 00* Alt. f2 $2 076 oo3 800 oo3

4 768 00 4 970 00 6 585 00

H e recommends the award of contracts to the lowest bidders as follows: Landscaping.—Swain Nelson & Sons Company on their base bid, including deductions provided under Alternates Nos. 1 and 2. In addition to these alternates, there are quotations from the contractor for changes in the size of the stock which will result in a further reduction in price of $1,111, which will be handled through the issuance of contract change orders after the execution of the contract. T h e amount of the contract to be awarded at this time, therefore, will be $7,609.04. T h e omission of the lawn work, Alternate No. 2, is considered necessary due to the fact that construction would force the work into the summer, which would make it impossible to complete the work during that period. It will be necessary, therefore, for the Physical Plant Department to provide for this work under its operation and maintenance appropriation next fall. Paving, Walks, Curbs, and Drives.-—King & Petry, on their base bid of $20,770.00. As a result of quotations received from King & Petry since the opening of bids, contract change orders will be issued, reducing this contract by

f i n a n c i n g expenses, insurance premiums, printing and office expense. the owner provides evergreen trees, deduct amount indicated. If the seeding operations are performed by others, deduct amount indicated. 'If flagstone paving for the north entrance walks is changed to brick, deduct amount indicated.