360

BOARD OF TRUSTEES Change O r d e r No. 5, contract with the W . E. O'Neil Construction Company for General Work. Change # 5 doors at north end of west wing corridor, first floor t o # 6 , a d d $ 17 25 Furnishing additional stirrups in beam in accordance with quotation of May 23, 1939, add 11 00 Additional cost of hauling rubbish t o date in accordance with paragraph #1022 of the Specifications, add 42 00 Additional concrete and excavating for minor incidental changes necessitated by bad soil conditions encountered under footings at depths indicated, add 27 20 Total additions $ 97 45 F o r substitution of manufacturers standard prime finish for bonderizing on hollow metal doors only, deduct $105 00 Net credit

[ J u l y 14

$ 755

Addition to Library Change O r d e r No. 1, contract with Anderson Electric Company for Electrical Work. Reroute conduit 6th to 10th floors in present building in closets to permit proper installation of book conveyor, add $137 50 First Addition to McKinley Hospital Change Order No. 2, contract with the Economy Plumbing & Heating Company for Plumbing, Heating, and Ventilating W o r k . Increase depth of sump pump and basin t o 6'-6" depth at an additional cost of $ 13 80 For additional i'-6" in length of pump, add 18 08 $ 32 78 Omission of laboratory tests of National Tube Company's steel pipe and "Arco" copper pipe called for in the specifications, deduct 30 00 Net addition $ 2 78 Change Order No. 5, contract with the Economy Plumbing & Heating Company for Plumbing, Heating, and Ventilating W o r k . Provide additional flashing sheet of lead on sides built into walls or partitions of all shower basins above basement. These additional flashing sheets shall extend not less than 5-2" above top of terrazzo basins and inside of lead pans provided in original contract, additional cost 39 08 Change Order No. 3, contract with W m . C. F . Kuhne for General Work. Rabbet corners of shower stalls above the basement and set marble in elastic cement in accordance with quotation dated May 26, 1939, additional cost 161 00 Change Order No. 4, contract with Wm. C. F . Kuhne for General Work. Changes in construction of elevator machine foundation to accommodate particular make installed, additional cost 54 64 Construction of small sump in basement t o provide access t o plumbing clean-out opening that otherwise would be inaccessible, a d d 9 51 Total additional cost $571 46 On motion of Mr. Pogue, the action of the President of the University in authorizing these change orders was approved and confirmed.