Caption: Board of Trustees Minutes - 1982 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1980] UNIVERSITY OF ILLINOIS 75 Medical Center New Contracts With Whom Garfield Park Community . Mental Health Center, Inc. National Foundation March of Dimes C-264 Southwest Research Institute State of Illinois, Department of Mental Health and Developmental Disabilities: 17-121-105-80 164 U.S. Department of Health, Education, and Welfare, National Institute for Occupational Safety and Health 210-80-0098 Total Purpose Evaluation services program for Illinois Department of Mental Health Subregion 4 The diagnosis of mucopolysaccharides and related biochemical defects Lubbock land treatment system research and demonstration program Amount to Be Paid to the University $ 25 000 20 000 262 349 Residency training in community psychiatry Comprehensive diagnostic training and treatment center for epilepsy Long-term medical effects of mixed solvent exposures 15 000 43 466 92 964 $ 458 779 Change Orders Purpose With Whom Statistical Coordinating Center for sickle cell U.S. National Institute* of disease Health, National Heart, Lung, and Blood Institute N01 HB 7 29&2 Research involving specific brain structures durU.S. Navy N00014-79-C-0420 ing wakefulness (SWS) (REMS) along with EEG, EOG, and EMG measurements Total Amount to Be Paid to the University $ 473 393 27 624 With Whom Bette L. Daily Total Amount to Be Paid by the University Purpose Coordinate all events and ceremonies associated $ 14 999 with the opening of the new University of Illinois Hospital $ 14 999 Amount to Be Paid by the University Purpose Cost-plus contract: Supply and ship 2,000 PT-40 * 14 700 phantom tubes to the Medical Center campus 12 599 Cost-plus contract: Heating and air conditioning work for the Rockford School of Medicine 23 800 Cost-plus contract: Heating and air conditioning work for the University of Illinois Hospital 14 825 Cost-plus contract: Heating and air conditioning work for the Nuclear Pharmacy 16 500 Cost-plus contract: Replace renal dialysis water system at the University of Illinois Hospital 14 959 Cost-plus contract: Catheterization Lab completion at the University of Illinois Hospital 15 000 Cost-plus contract: Install shelves, hangers, rods, and door closers at the University of Illinois 13 356 Hospital Cost-plus contract: Relocate General Stores to 23 532 the Formfit Building Cost-plus contract: Furnishing and installation of display cabinets for the University of Illinois 12 826 Hospital Cost-plus contract: Shielding and vent for linear 20 300 accelerator at the University of Illinois Hospital 21 000 Cost-plus contract: Installation of a small linear accelerator at the University of Illinois Hospital 21 788 Cost-plus contract: Installation of a large linear accelerator at the University of Illinois Hospital Cost-plus contract: Revisions to floor surfaces at the University of Illinois Hospital New Contract $ 501 017 Change Orders With Whom G St M Electrical Contractors Co. The Nu-Way Contracting Corporation Wm. J. Scown Building Co.
|