68

BOARD OF TRUSTEES

[September 18

General Purpose Office Building (continued) offices. The building, which will be located on the UrbanaChampaign campus, is programmed to include primarily single station offices plus necessary service and support areas.

Contract for Tile Replacement, Intramural-Physical Education Building, Urbana

(28) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract in the amount of $42,320 to Carter Tile Company, Champaign, the low bidder on its base bid and additive alternate # 1 , to replace approximately 7,800 sq. ft of quarry floor tile in the Intramural-Physical Education Building at the Urbana campus. This project is a part of the Auxiliary Facility Repair and Remodeling Projects submitted to the Board of Trustees for FY 1981. Funds are available in the Auxiliary Facility System Repair and Replacement Reserve Account. (At the time the TMPE Building was constructed in 1971, 26,000 sq. ft. of quarry tile was installed. The quarry tile in certain areas has delaminated from the setting bed as the result of expansion. Following the occupancy of the building, approximately 9,800 sq. ft. of tile was replaced at the expense of the contractor, the architect, and the University. This project is to install, with the appropriate expansion joints, tile with an epoxy mortar which has a tensile bonding strength rated approximately seven times greater than standard mortar.) O n m o t i o n of D r . D o n o g h u e , t h i s r e c o m m e n d a t i o n w a s a p p r o v e d b y t h e following v o t e : Aye, D r . D o n o g h u e , M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . Lenz, M r . Neal, Mrs. Shepherd, M r . Stone, M r . Velasquez; no, n o n e ; absent, Governor T h o m p s o n . ( T h e student advisory vote w a s : Aye, M r . Maltese, M r . Peterson, M r . Silverman; no, none.)

Contract to Resurface Tennis Courts, Huff Gymnasium, Urbana

(29) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract in the amount of $49,988.50 to Champaign Asphalt Company, Urbana, the low bidder on its base bid and additive alternate A, to resurface eight tennis courts adjacent to Huff Gymnasium at the Urbana-Champaign campus. T h e Athletic Association has agreed to provide one half of the total cost of this project. Funds for the balance of the project are available in the FY 1981 Campus Operating Budget for Rehabilitation and Alterations. The following bids for this project were received on August 29, 1980: Contractor Champaign Asphalt Company, Urbana University Asphalt Company, Urbana Base Bid $26 273 50 32 172 00 Alternate A $23 715 00 24 150 00

(The work consists of applying an asphalt overlay to the existing court surfaces and the installation of net posts and nets. Alternate A is for a colored sealant material which will provide markings and a durable, nonslip seal and surface coat for outdoor courts. T h e work is scheduled to begin October 1, 1980, and be completed by November 30, 1980.)

O n motion of Dr. Donoghue, this recommendation was approved by the following vote: Aye, Dr. Donoghue, M r . Forsyth, M r . H a h n , Mr.