UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1982 [PAGE 612]

Caption: Board of Trustees Minutes - 1982
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 612 of 658] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Butler, J., recipient of Navy Pier Hall of Fame award, 413 Byers, L., member of advisory committee, 317 Bylaws, Board of Trusees, See Board of Trustees, Bylaws CBM Concrete Co., contract, 266 Cade, H., member of advisory committee, 88 Cadwell, C. N., Estate, bequest, transferred to the Medical Research Support Fund (Medical Center). 401 Cain, Wayne, & Sons, contract, 292 Cain, Wayne, & Sons Roofing & Sheet Metal Co., contract, 502, 503 California, University of, contract, 129 change, 130 California, University of, Regents contract, 31 Callaghan, J. D., appointment, 495 Call an, R. M., member of advisory council, 361 Cameron, W. T., director of Athletic Association, 197 Camilleri, D. D., appointment, 468 Campaign for Illinois, gift from United Technologies Corporation, for remodeling the semiconductor and integrated circuit fabrication facility in the Electrical Engineering Building (Urbana), 502 gifts, 534 report, 440 Canmo, A., member of advisory committee, 319 Capital Development Board, capital appropriations, Chicago Circle, energy conservation projects, remodeling, 350 lighting modifications, remodeling, 349 masonry repairs, remodeling, 349 stairway repairs, remodeling, 349 Medical Center, energy conservation projects, remodeling, 350 Hospital Addition, remodeling, 349 mechanical equipment, remodeling, 44 Medical Pharmacy Building, Second Unit Dental, equipment, 44 _ power plant, study of feasibility of utilizing Illinois coal, 44 Urbana, Abbott Power Plant, conversion to coal-fired boiler system, remodeling^ 44 Agricultural Engineering Sciences Building, 44 Airport, University of Illinois-Willard, conversion from oil to gas, 349 computer laboratory cooling system, remodeling, 44 energy conservation projects, remodeling, 350 English Building, Phase II, equipment, 44 Gregory Hall, ventilation system, remodeling, 350 Large Animal Clinic, heat recovery system, remodeling, 350 ventilation system, remodeling, 350 Lbirary, sixth stack addition, building, 349 planning, 44 utilities, 349 steam absorption machines, remodeling, 44 Swine Research Center, equipment, 44 ventilation ducts, remodeling, 44 Veterinary Medicine Basic Sciences Building, equipment, 44, 350 contract, 267 Airport, University of Illinois-Willard fuel conversion, architectural services, 335 engineering services, 335 amendment, 452 Chicago Circle, Architecture and Art Building, lighting modifications, architectural services, 335 engineering services, 335 Education Communications Building, exterior and interior masonry repairs, architectural service^ 335 engineering services, 335

601

Capital Development Board, cont'd energy conservation projects, architectural services, 335 engineering services, 335 Lecture Center, electrical upgrade, architectural services, 335 engineering services, 335 lighting modifications, architectural services, 335 engineering services, 335 Services Building, electrical upgrade, architectural services, 335 engineering services, 335 stairway and upper walkway repairs, architectural services, 335 engineering services, 335 Medical Center, energy conservation projects, architectural services, 335 engineering services, 335 Hospital Addition, construct utility shafts, architectural services, 335 engineering services, 335 install acid waste risers, architectural services, 335 engineering services, 335 install domestic water and waste risers, architectural services, 335 engineering services, 335 install laboratory utility risers, architectural services, 335 engineering services, 335 revise and install ventilation system, architectural services, 335 engineering services, 335 Urbana, Abbott Power Plant conversion, architectural services, 69 engineering services, 69 Computer Lab, process cooling, architectural services, 69 engineering services, 69 energy conservation projects, architectural services, 335 engineering services, 335 Library, sixth stack addition, architectural services, 69, 335 engineering services, 69, 335 seal ventilation ducts, architectural services, 69 engineering services, 69 steam absorption machine control, architectural services, 69 engineering services, 69 report of bids, 29, 340, 381, 407, 431, 453, 479 504, 585 Carl, P. L v invention, patent rights, release to sponsoring agency, 17 Carle Foundation contract, 285, 581 Carlisle, S., member of advisory committee, 318 Carlson, R. W., appointment, 11 Carnegie-Mellon University, contract, change, 241, 300 Carpenter, E. S., appointment, 59 Carpet repair and replacement, contract, Medical Center, Library of Health Sciences, 450 Carr Hall (Urbana), contract, roof resurfacing, 334 Carrier Machinery & Systems Division, contract, 451 Carroll County ASCS Committee, lease, renewal, 294 Carter, M. 0-> member of advisory committee, 319 Carter, P. B., appointment, 198 Carter Tile Company, contract, 68 Case International Company, contract, change, 102 Casper, J. D., appointment, 144 member of Center for Advanced Study, 497 Cassidy, M. F., appointment, 91 Celanese Chemical Co., contract, 127 Center for Advanced Study (Urbana), members, appointments, 199, 255, 367, 496, 540