Caption: Board of Trustees Minutes - 1982 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
184 BOARD OF T R U S T E E S [February 19 Amount to be Paid by the University $ 13 800 New Contracts With Whom The Glen Ellyn Cinic S.C. Corp. (Subcontract under U.S. Department of Health, Education, and Welfare 1 R01 NS15100-01) Total Purpose Recruit participants to measure back motion and strengths in low-back syndrome patients and in healthy subjects Change Orders With Whom City of Chicago University of Chicago, Argonne National Laboratory G. F. Connelly Co., Inc. Total Purpose Determine the allowable energy conserving measures to be used in the home or apartment Assignment of Dr. Chiu as scientist in residence Error by contractor in preparation of bid $ 13 800 Amount to be Paid to the University $ 28 182 15 573 (10 824) $ 32 931 Amount to be Paid by the University $ 18 500 18 500 Work Orders Purpose Install new wiring and electric power in southeast part of the Formfit building With Whom G&M Electrical Contractors Co. Total Medical Center New Contracts With Whom Illinois Cancer Council World Health Organization Total Purpose Patient accrual, treatment, and follow-up and development of new protocols Literature surveillance on plants associated with potential fertility-regulating activity Amount to be Paid to the University $ 8 265 30 000 $ 38 265 Change Orders With Whom Northwestern University PARFR-95N United States Environmental Protection Agency 68-03-2562 Total Purpose Develop a reversible VAS deferens blocking device Evaluation of photo dynamic biomass data on organic extracts Amount to be Paid to the University $ 108 548 12 010 $ 120 558 Work Orders With Whom The Narowetz Heating & Ventilating Co.: 005464 005457 Tal Rauhoff Inc. Total Purpose Ventilation work to modify the nurses' call system in O.R. suite Replace sheaves and belts and rebalance air quantity for the ventilation system in the University of Illinois Hospital Removal of construction rubble from University of Illinois Hospital Amount to be Paid by the University $ 13 542 24 000 20 045 57 587 Urbana-Champaign New Contracts With Whom American Meat Exchange Bat telle Memorial Institute The Bio-Energy Council Holstein-Friesian Association of America Purpose Conduct a test of electronic marketing of meat Calculate the probable leach rates of nuclear waste forms by aqueous solutions Evaluation of grass-legume biomass production systems Genetic evaluation of categorical traits in Holstein cattle Amount to be Paid to the University J 165 000 97 712 27 000 16 400
|