Caption: Board of Trustees Minutes - 1982 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
156 BOARD OF T R U S T E E S (January 15 Amount to »e Paid by the University $ 23 482 15 000 13 179 16 350 20 000 $ 149 040 With Whom Pepper Construction Co, Tal Rauhoff, Inc. Purpose Cost-plus contract: Upgrade Alter systems for the fan systems in the Science and Engineering Laboratories Cost-plus contract: Rubbish removal via containers and snow removal for Chicago Circle Pavilion Cost-plus contract: Drape replacement for the Lecture Center Cost-plus contract: Construction of a wheelchair lift at the Formfit Building Cost-plus contract: Glass replacement for various Chicago Circle buildings Total Medical Center New Contracts With Whom Illinois Institute of Technology (Subcontract under U.S. Public Health Service 1D18MB00282-01) Methodist Medical Center Pekin Memorial Hospital Saint Francis Hospital Medical Center State of Illinois, Department of Mental Health and Developmental Disabilities 213 United States Environmental Protection Agency 68-03-2936 United States Naval Administrative Command N00128-80-C-0029 World Health Organization 77918(c) Total Purpose Chicago area health and medical career program Amount to be Paid to the University $ 5 076 Design a curriculum in rheumatology Design a curriculum in dermatology Design a curriculum in neurology Conduct an Affective Disorders Clinic Microbial dissimilation of 2,3,7,8 — Tetrachlorodibenze-P-Dioxin Analysis of crevicular fluid in diagnosis of periodontal disease Isolation of fertility regulating agents from plants 20 988 9 733 17 320 91 206 74 984 33 953 76 476 $ 329 736 Change Orders With Whom City of Chicago 47752 Northwestern University 0695-309 State of Illinois, Institute of Natural Resources 90.023 United States Department of Health, Education, and Welfare, National Cancer Institute N01-CB-74214 World Health Organization 78135 Total Purpose Model sexually transmitted disease training center Nurse faculty research development in the Midwest Improvement of environmental and economic impact assessments for coal burning Preparation and analysis of cell surface protein fraction Isolation of fertility regulating compounds from plants Amount to bt Paid to the University % 90 736 101 922 36 850 25 942 31 868 $ 287 318 Amount to be Paid by the University $ 22 409 18 360 $ 40 769 Work Orders With Whom The Nu-Way Contracting Corp. Purpose Cost-plus contract: Heating and air conditioning work at the University of Illinois Hospital Cost-plus contract: Conduit cable extended from computer facilities to the nuclear medicine room Total
|