UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1986 [PAGE 90]

Caption: Board of Trustees Minutes - 1986
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 90 of 688] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1984]

UNIVERSITY OF ILLINOIS

79

Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contracts for Mechanical Equipment, Clinical Laboratories, Chicago

(36) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of contracts for remodeling a fan and equipment room to provide mechanical equipment on the fourth floor of the Clinical Sciences Building, Chicago. T h e award in each case is to the low bidder. Division III — Mechanical Oak Brook Mechanical Services, Inc., Elmhurst Division IV — Ventilation Illinois Mechanical Contractors, Inc., Franklin Park Division V—Electrical Goulding Electrical Construction, Inc., Wheeling Total Base Bid $ 57 880 178 842 32 000 $268 722

Funds are available in the Hospital Income Fund. This project will provide a new, independent heating and ventilating system for a laboratory complex currently proposed for the Hospital Clinical Laboratories. T h e work will include installation of a supply fan and an exhaust fan, plus associated piping, ductwork, electrical work, etc. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r s . D a y , these c o n t r a c t s w e r e a w a r d e d by t h e following v o t e : Aye, M r s . D a y , D r . D o n o g h u e , M r . F o r s y t h , M r . H a h n , M r .

Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contract for Interior Development, Plant Pathology, Urbana

(37) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of contracts for the interior development of the Plant Pathology Shop and Storage Building, College of Agriculture, Urbana-Champaign. T h e work will convert the south half of the farm-equipment storage shed into labs and office space for plant pathology. The award in each case is to the low bidder. Division I — General R&B Enterprises, Princeville Division II — Plumbing A & R Mechanical Contractors, Inc., Urbana Division V — Electrical Coleman Electrical Service, Inc., Mansfield Total Base Bid $37 476 22 200 15 895 $75 571

Funds are available from private gift funds available within the College of Agriculture's operating b u d g e t