EXTRACTED TEXT FROM PAGE:



1986]

UNIVERSITY OF ILLINOIS

511

Division IV— Ventilation and Air Distribution T n T Mechanical Contractors, Inc., Urbana . . Base Bid Alt. 2 . . Alt. 3 . . Alt. 4 Division V — Electrical Witte Electric Company, Champaign

$ 12 1 4 6

743 650 819 060

$ 25 272

Base Bid Alt. 2 . . Alt. 3 . . Alt 4 . .

26 3 4 3

315 399 847 683

38 244 $321 236

Total

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. Funds are available from the restricted funds operating budget of the Water Survey Division ($131,236) and the State-appropriated funds budget of the Urbana campus ($190,000). A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . M a d d e n , these contracts were a w a r d e d by the foll o w i n g v o t e : A y e , M r s . D a y , M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, n o n e ; absent, Governor T h o m p s o n . ( T h e student advisory v o t e w a s : Aye, M r . Becker, M r . L a m m ; n o , none.)

Remodeling, Water Resources Building and Employment of Architect/Engineer, Urbana

(20) In 1982, a plan was proposed to move the State Water Survey from the Water Resources Building to a renovated Adler Clinic facility; and the Water Resources Building, which contains approximately 40,000 gross square feet, was to be renovated for the microelectronics center for the Department of Electrical Engineering at Urbana. Later, funds were provided for a new and larger facility for the microelectronics center. Is it now proposed that half of the vacated Water Resources Building be remodeled from the National Center for Supercomputing Applications at a project cost of $967,900. The president of the University, with the concurrence of the appropriate administrative officers, recommends: (1) the approval of the project described; and (2) the employment of Isaksen and Matzdorff, Architects, P.C., Urbana, to provide the professional services required in the development of the contract documents for remodeling the Water Resources Building for the National Center for Supercomputing Applications. The cost of the professional services through the receipt of bids will be at a fixed fee of $63,200, plus authorized reimbursements estimated to be $4,000. After the receipt of bids for the project, the board will be requested to approve contracts for construction and to authorize the balance of the architectural and engineering services required during the construction phase. This project will be financed from the institutional funds budget of the Urbana campus.