1985]

UNIVERSITY OF ILLINOIS

385

On motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mrs. Shepherd, Miss Smith; no, none; absent, Mr. Madden, Governor Thompson. (The student advisory vote was: Aye, Mr. Becker, Mr. Lamm; no, none.)

Contract for Reroofing Chicago Circle Center, Chicago

(19) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $273,700 to F. J. A. Christiansen Roofing Corporation, Carol Stream, the low bidder on its base bid, to replace the roof system of the low-rise building, Chicago Circle Center, Chicago. The existing roof and flashings system have failed, resulting in complete water saturation of the roof insulation and subsequent water leakage. This project provides a completely new roof and flashings system, which is bondable for ten years. Funds are available from the Auxiliary Facilities System Repair and Replacement Reserve. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Howard, this contract was awarded by die following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mrs. Shepherd, Miss Smidi; no, none; absent, Mr. Madden, Governor Thompson. (The student advisory vote was: Aye, Mr. Becker, Mr. Lamm; no, none.)

Contracts for First Floor Enclosure, Burrill Hall Annex, Urbana

(20) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts. The award in each case is to the low bidder on its base bid, plus acceptance of the indicated alternate,1 to enclose and complete the first floor of Burrill Hall Annex, Urbana. Division I — General English Brothers Company, C h a m p a i g n . . . . Base Bid . . . $356 800 Alt. G-6 . . . 3 000 $359 800 Division II — Plumbing Illini Plumbing & Heating, Inc., Champaign

Base Bid . . . Alt. P-6 . . .

89 095 230 89 325

Division III — Heating A & R Mechanical Contractors, Inc., Urbana Division IV — Ventilation R. H. Bishop Company, Champaign

Base Bid . . .

72 000

Base Bid . . . Alt. V-6 . . .

68 619 9 980 78 599

1

A description ot the alternate is filed with the secretary ol the board lor record.