UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1986 [PAGE 254]

Caption: Board of Trustees Minutes - 1986
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 254 of 688] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1985]

UNIVERSITY OF ILLINOIS

243

Surface Parking Lot at Taylor and Wood Streets Repair of Paulina Street Parking Structure Upgrading of Parking L o t # 9 at Morgan and Harrison Streets Urbana-Champaign campus Renovation of Busey-Evans Residence Halls Renovation of McKinley Health Center Renovation of Ice Arena South Recreation Structure Renovation and Addition of Memorial Stadium Football Facilities Baseball Stadium Memorial Stadium Air-Supported Structure Athletic Center Site Development Projects To Be Funded from Reserve Funds and Gift Funds

Chicago campus Lighting of Recreation Fields and Tennis Courts Urbana-Champaign campus Replacement Track Facility On motion of Mr. Howard, approval was given as recommended. (Mr. Forsyth asked to be recorded as voting against three of the projects listed, viz., the Ice Rink and Ice Arena at Chicago and Urbana respectively, and the South Recreation Structure at Urbana. The two student trustees asked that an advisory vote be recorded for them in favor of all of the projects except the following: Mr. Pittman—-the Residence Hall and Ice Rink at Chicago; Mr. Lamm — the South Recreation Structure at Urbana.) By consensus, the board agreed that one roll call vote would be taken and considered the vote on each agenda item nos. 23 through 35 inclusive. The recommendations were individually discussed but acted upon at one time. (The record of board action appears at the end of each item.)

Contract for Fume Hood Replacement, Science a n d Engineering South, Chicago (23) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $67,000 to the Robert Irsay Company, Skokie, the low base bidder, to replace 18 fume hood exhaust fans and motors in the Science and Engineering South Building, Chicago campus. Funds are available in the Fiscal Year 1985 Institutional Funds budget of the Physical Plant at Chicago. This is the initial phase of a program to upgrade and repair fume hoods that do not meet safety standards. The second phase, which will include the replacement of 35 additional hoods in the building, will be implemented in FY 1986. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Forsyth, this contract was awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr.