|
| |
Caption: Board of Trustees Minutes - 1988 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1988] UNIVERSITY OF ILLINOIS 473 Division I— General John Wright Construction, Champaign Base Bid Alt. G-l Alt. G-2 Alt. G-3 Alt. G-4 . . . $277 104 ... 5 382 ... 300 ... 5 325 ... 700 $288 811 Division II — Plumbing Nogle and Black Heating & Air Conditioning Co., Inc., Champaign Division III—Heating, Ventilation, and Temperature Control Nogle and Black Heating & Air Conditioning Co., Inc., Champaign Division IV — Electrical Witte Electric, Urbana Base Bid . . . 26 477 Base Bid . . . $ 24 970 Alt. H-2 . . . 7 670 32 640 Base Bid . . . $ 47 650 Alt. E-2 . . . 880 48 530 $396 458 Total It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. The project consists of construction of two dance studios with lockers and restrooms and a small office area totalling approximately 7,100 gross square feet. The two-story facility will be frame construction with metal siding and will contain a forced hot-air heating system. A schedule of the bids received has been filed with the secretary of the board for record. Funds for this project will be provided from the Fiscal Year 1988 State appropriated funds budget of the campus. O n motion of Mr. Wolff, these contracts were awarded by the following vote: Aye, Mrs. Calder, M r . Forsyth, Mrs. Gravenhorst, Mr. H a h n , Mr. Howard, Mr. Logan, Miss Smith, Mr. Wolff; no, none; absent, Mrs. Shepherd, Governor Thompson. ( T h e student advisory vote was: Aye, Mr. Evenson, M r . Wylie; no, none.) Contract, Site Development, Beckman Institute, Urbana (16) On January 21, 1988, bids were received for the site development work for the Beckman Institute at the Urbana campus. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $680,433 to Imperial Concrete Company, Inc., and Roessler Construction Co., both of Champaign and a joint venture. The work includes the demolition of the Beckman Project Office Building and of security fencing; and removal of all existing paving and trees except the trees on the President's Walk on University Avenue and street trees on Wright Street. The construction work includes rough grading of the entire site and construction of all concrete drives, parking, and sidewalk paving.
| |