|
| |
Caption: Board of Trustees Minutes - 1988 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1986] UNIVERSITY OF ILLINOIS 31 Division I — General W. Commercial Builders, Inc., Champaign Base Bid Alt. G-l $353 000 9 781 $362 781 Division II— Plumbing A & R Mechanical Contractors, Inc., Urbana Base Bid 68 660 Division III — Heating, Piping, Refrigeration, and Temperature Control Reliable Plumbing & Heating Co., Champaign Base Bid Division IV — Ventilation and Air Distribution Reliable Plumbing & Heating Co., Champaign 29 639 Base Bid 6 970 139 253 $607 303 Division V — Electrical Leverenz Electric Co., Inc., Danville.. . Base Bid Total It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. It is also recommended that the firm of Unteed, Scaggs, Nelson, Ltd., Champaign, be employed for professional services required during the construction phase at a fixed fee of $26,500. Funds are available from the restricted funds operating budget of the Urbana campus, Division of Telecommunications. The work consists of space realignment, interior finishes, air conditioning, new lighting in certain areas, and fire alarm/emergency lighting in five locations (Scott Hall, Children's Research Center, Davenport Hall, Florida Avenue Residence Halls, and Willard Airport) as well as a new underground structure north of the Transportation Building which will serve the north campus. A schedule of the bids received has been filed with the secretary of the board for record. Since the subsoil conditions on the north side of the Transportation Building adjacent to the new underground node site may require stabilization, two styles of shoring were bid as unit costs within the general division of work. As the soil conditions dictate, the appropriate shoring design will be utilized. The contract price will be adjusted by multiplying the type of shoring times the amount of square feet utilized. O n motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Howard, M r . Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (Mr. H a h n asked to be recorded as not voting.) ( T h e student advisory vote was: Aye, Mr. Filip; no, none; absent, Mr. Starkeson.) Contract for Asbestos Removal, Urbana (27) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract, subject to the availability of funds, to Curry Environmental Services, Inc., Rock Island, on its base bid to
| |