Caption: Board of Trustees Minutes - 1988 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
Table 4 (continued) Budget Project Category HSC Campus Emergency Power Dist. — Phase 3 Util. 21 UC Campus Site Improvements Site 22 UC Compound Semiconductor Microelec. Center Equip. 23 UC Campus Police Station Bldg./Util. 24 C Remodel Pharmacy Building Remd. 25 UC Digital Computer Laboratory Addition . . . Equip. 26 UC Mechanical Engineering Laboratory Remd. 27 UC Main Library Remodeling Plan. "Build Illinois" Requests' C / U C Repair and Renovation Program — Phase 4 Remd. Priority 20 Campus C FY 1989 Request 1 190.0 1510.0 500.0 2 030.5 1750.0 500.0 3 700.0 170.0 University 64 416.0 65 926.0 66 68 70 70 74 74 426.0 456.5 206.5 706.5 406.5 576.5 Cumulative Cost Chicago 44 468.0 21458.0 21958.0 23 988.5 46 218.0 24 488.5 28 188.5 28 358.5 Urbana c g g g a 3 O 11 Z O 01 7 834.0 * Because this project serves the_ needs of both the Chicago and Urbana-Ghampaign campuses, the cost may be applied on an equal basis to both. For the purpose of this table. thet entire project cost will be included under Chicago. * "Build Illinois" projects are non-prioritized.
|