Caption: Board of Trustees Minutes - 1988 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1987] UNIVERSITY OF ILLINOIS 249 bid. Therefore, pursuant to the provisions of Article II, Section 4 (k) (2) of the General Rules Concerning University Orgamzation and Procedure, the bids for this work have been rejected and the president now reports their rejection. One bid was received for Division "L"; however, the bidder failed to submit the bid security as required. One bid was received for "T," but the bidder did not submit a proposal for the base bid work. Due to improper bidding of these divisions, they are considered "no bid," and Divisions L, M, and T will be rebid as soon as practical. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts. The award in each case is on the basis of the lowest responsive base bid, plus acceptance of the indicated alternates. Division III A — Curtaxnwall, Windows, Skylights, Interior, Glazing Bacon and Van Buskirk Glass Co., Inc., Champaign Base Bid . . . $2 157 000 Alt. J-l . . . . 16 000 $ 2 173 000 Division IIIB — Metal Roofing; Roofing, Sheet Metal, Waterproofing Young Sales Corporation, St. Louis, Missouri Base Bid Division IIIC — Plumbing, Lab Gas Work Natkin & Company, Peoria Base Bid Alt. B Alt. D . . Alt. G . . Alt. H. . Alt. P-2 Alt. P-3 Alt. P-4 Alt. P-5 Division HID — Fire Protection The PIPCO Companies, Ltd., Peoria 760 389 1 590 000 690 1 250 195 24 750 n/c n/c 385 175 1 617 445 Base Bid Alt. B Alt. C . . Alt. D. . Alt. E. . . Alt. P-3 Alt. P-4 Controls Base Bid Alt. B Alt. C . Alt. D . Alt. G. . Alt. J-l Alt. P-4 Alt. P-5 Alt. P-6 Alt. Q . 663 110 370 3 900 4 900 3 900 115 235 676 530 Division HIE — Heating, Temperature Natkin & Company, Peoria 036 000 430 1 195 140 18 800 9 750 540 4 225 475 55 400 2 126 955
| |