UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 257]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 257 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1987]

UNIVERSITY OF ILLINOIS

247

In Witness Whereof, the parties hereto, acting under the authority of their respective governing bodies, have caused this agreement to be executed. Exhibit A ("the Airport Project") Construct a new terminal complex in the Southeast quadrant of University of Illinois-Willard Airport, including: Construct 60,000 ± square foot terminal building taxiway, entrance road, and auto parking area, including drainage, grading, lighting, marking, signage, utilities, and landscaping. Contracts, Atmospheric Sciences Office Building, Urbana (16) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for construction of the Atmospheric Sciences Office Building at the Urbana campus. The award in each case is to the low base bidder plus acceptance of the indicated alternates.1 Division I — General W. Commercial Builders, Inc., Champaign Base Bid . Alt. G-l . . Alt. G-2 . . Alt. G-3 . . Alt. G-4 . . Alt. G-5 . . $419 11 2 6 5 4 921 000 000 700 400 800 $449 821 Division II — Plumbing Illini Plumbing & Heating, Inc., Champaign. Division III — Heating and Air Conditioning Reliable Plumbing & Heating Company, Champaign Division IV — Ventilation T*nT Mechanical Contractors, Inc., Urbana Division V — Electrical Coleman Electrical Service, Inc., Mansfield Base Bid . 44 335

Base Bid Base Bid Base Bid Alt E-5 . Alt. E-6 . 109 546 15 926 3 117

36 190 61 000

128 598 Total $719 944 It is further recommended (1) that all contracts, other than the contract for general work, be assigned to the contractor for general work; and (2) that the firm of Rettberg-Gruber, Architects, Champaign, be employed for professional services required during the construction phase for administration and on-site observation at a fixed fee of $21,920, plus reimbursements authorized by the University, estimated at $500. State appropriated funds are available in the Fiscal Year 1987 operating budget of the Office of the Vice Chancellor for Academic Affairs at Urbana. The project will be a two-story, wooden frame structure with offices, laboratories, computer rooms, library, and a classroom/conference area totaling 11,300 gross square feet (7,700 net assignable square feet). A schedule of the bids received has been filed with the secretary of the board for record.

* A schedule of the alternate* is filed with the lecratar? of the board for record.