EXTRACTED TEXT FROM PAGE:



144

BOARD OF TRUSTEES

[November 13

FY 1987 Professional Firm Recommended Project Budget Project To be selected. Mechanical Engineering Building $ 45 000 Remodeling (Plan) — Plan Remodeling of Rooms 215, 216, and 221 Davenport Hall Remodeling (Plan) — 40 000 T o be selected. Plan Remodeling of Second Floor of East Wing Bevier Hall Remodeling (Plan) — 35 000 To be selected. Plan Air Conditioning of Entire Building Building Roof Repairs — Psychology 440 000 Sevems, Rishling & Associates, Building and Roger Adams Champaign Laboratory 320 000 Henneman, Raufeisen and Steam Absorption Machine ReplaceAssociates, Inc., Champaign ments and Repairs — Library A / C Center and StudenV'Staff A / C Center Masonry and Tuckpointing Repairs — 290 000 Isaksen, Matzdorfi, Glerum Roger Adams Laboratory and and Associates, Urbana Coordinated Science Laboratory Cooling Tower Repairs — 210 000 S & R Engineering, Inc., Administration Building, Student/ Urbana Staff Apartments, Art and Design Building Electrical Load Center Replacement — 190 000 Henneman, Raufeisen and Associates, Inc., Champaign Remodel Load Centers 32 and 38 to Replace Load Center 34 Electrical Air Conditioning 230 000 Brown, Davis, Mullins & Replacements —• Lincoln Hall and Associates, Champaign Law Building Pilot Training Building Repair — 88 000 T o be selected. Miscellaneous Roof and Interior Repairs to Metal Building Elevator Replacement (Plan) — ESCA Consultants, 16 000 Plan Replacement of Lincoln Hall Urbana Elevator Steam and Condensate System Repairs 20 000 T o be selected. (Plan) —Plan Pump Replacement Programs Waste Pipe System Repairs (Plan) — 19 100 To be selected. Plan Repair in Burrill Hall, Turner Hall, Noyes Laboratory Electric Air Conditioning Repairs 16 000 To be selected. (Plan) — Plan Additional Repairs in Law Building PCB Electric Transformer Replace180 000 Brown, Davis, Mullins & ment -— Replace PCB Transformers in Associates, Champaign Four Buildings University High School Improve130 000 Unteed, Scaggs, Nelson, Ltd., Champaign ments — Correct Code Violations and Plan Elevator Location